Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/04/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-1023-01659
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
01/04/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/09/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01659
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 4
Date Name
01/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/09/2024 Post-Tension Inspection Report is required.
01/09/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1023-01659
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
10/19/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01659
Permite Description: SFR BT1383-130 T22-M0014
Total Outstanding Inspections - 2

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01659
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 20
Date Description Inspector Results Comments
01/29/2024 COT - RSPL - Rough Soil Passed
01/29/2024 COT - RSPL - Sewer Passed
01/29/2024 COT - RSPL - Yard Water Line Passed
02/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/05/2024 COT - RSBU - Preslab Passed
02/05/2024 COT - RSEL - Grounding/Bonding Passed
02/26/2024 COT - RSBU - Roof Nailing Passed
02/28/2024 COT - RSBU - Exterior Clips/Sheathing Passed 2/28/24: all corrections made
03/28/2024 COT - RSPL - Gas Pressure Test Passed
04/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4/5/24: Fresh air ductwork has been replaced, plumbing is under test. Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall.
04/10/2024 BULD - Electrical Clearance Passed TEP ECO
04/23/2024 COT - RSBU - Interior Shear Bracing Passed
06/20/2024 COT - BULD - SWG Clearance Passed
07/02/2024 COT - RSEL - Electrical Final Passed
07/02/2024 COT - RSEL - Outdoor Lighting Passed
07/02/2024 COT - RSME - Mechanical Final Passed
07/02/2024 COT - RSPL - Plumbing Final Passed
07/02/2024 RSBU - Building Progress Passed
07/02/2024 ENGR Engineering Final Passed
07/02/2024 RSBU - Building Final Passed