Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
11/30/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1383-130 T22-M0014

Permit Reviews

Permit Number - TC-MDP-1023-01656
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Start Date Submittal Complete Date Status  
12/01/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/07/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01656
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Total Outstanding Activity Conditions - 4
Date Name
12/01/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/01/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/01/2023 Post-Tension Inspection Report is required.
12/01/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1023-01656
Permit Status: Inspections complete
Permit Description: SFR BT1383-130 T22-M0014
Date Description Comments
10/19/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01656
Permit Description: SFR BT1383-130 T22-M0014
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/13/2023 COT - RSPL - Rough Soil Passed Underground plumbing lines are installed and under a water test. Okay to shade and backfill trenches.
12/13/2023 COT - RSPL - Yard Water Line Passed Water line is under 70# psi air pressure, blue tracer wire is connected to pipe through trench. Okay to backfill trench.
12/13/2023 COT - RSPL - Sewer Passed Underground plumbing is connected to the main sanitary sewer line. Okay to shade and backfill trench.
12/21/2023 COT - RSEL - Grounding/Bonding Passed
12/21/2023 COT - RSEL - Electrical Underground Passed
12/22/2023 COT - RSBU - Preslab Passed 12-22-23: rebar reinforcement has been installed around tub boxes. Okay to pour concrete for footings and slab on grade.
12/22/2023 COT - RSBU - Excavation/Rebar/Zoning Passed 12-22-23: rebar reinforcement has been installed around tub boxes. Okay to pour concrete for footings and slab on grade.
01/11/2024 COT - RSBU - Exterior Clips/Sheathing Passed
01/12/2024 COT - RSBU - Roof Nailing Passed 1/12/24: Lateral truss bracing has been installed on front and rear of house.
02/29/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/18/2024 COT - RSBU - Interior Shear Bracing Passed Interior shear wall drywall is properly installed and secured to the studs with the proper nail pattern as called out on plans. Okay to proceed with tape and texture of all walls and ceilings.
04/10/2024 BULD - Electrical Clearance Passed TEP ECO
05/15/2024 COT - BULD - SWG Clearance Passed SWG for meter only
05/15/2024 COT - RSPL - Gas Pressure Test Passed
05/15/2024 COT - RSEL - Electrical Final Passed
05/15/2024 COT - RSEL - Outdoor Lighting Passed
05/15/2024 COT - RSME - Mechanical Final Passed
05/15/2024 COT - RSPL - Gas Final Passed
05/15/2024 COT - RSPL - Plumbing Final Passed
05/15/2024 ENGR Engineering Final Passed
05/15/2024 RSBU - Building Final Passed
05/15/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA 85 SIC-2023-11-30_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 1 - LOT 85 START_V1.PDF DOCUMENTS VIEW