Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/18/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1740-130 T22-M0015

Permit Reviews

Permit Number - TC-MDP-1023-01653
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Start Date Submittal Complete Date Status  
10/19/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/24/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01653
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Total Outstanding Activity Conditions - 3
Date Name
10/19/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/19/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/19/2023 Post-Installed Anchor Inspection Report is required.

Conditions

Permit Number - TC-MDP-1023-01653
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Date Description Comments
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01653
Permite Description: SFR BT1740-130 T22-M0015
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/08/2024 RSBU - Building Progress N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01653
Permit Description: SFR BT1740-130 T22-M0015
Total Completed Inspections - 20
Date Description Inspector Results Comments
11/03/2023 COT - RSPL - Yard Water Line Passed
11/03/2023 COT - RSPL - Sewer Passed
11/03/2023 COT - RSPL - Rough Soil Passed
11/09/2023 COT - RSBU - Excavation/Rebar/Zoning Passed
11/09/2023 COT - RSBU - Preslab Passed
11/09/2023 COT - RSEL - Electrical Underground Passed
11/09/2023 COT - RSEL - Grounding/Bonding Passed
11/27/2023 COT - RSBU - Exterior Clips/Sheathing Passed
11/27/2023 COT - RSBU - Roof Nailing Passed
12/29/2023 BULD - Electrical Clearance Passed
01/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/5/24: Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with insulation and drywall installation.
01/05/2024 COT - RSPL - Gas Pressure Test Passed Gas lines are under 15# of compressed air without leaks.
01/16/2024 COT - RSBU - Interior Shear Bracing Passed
03/08/2024 COT - BULD - SWG Clearance Passed CLEAR GAS
04/08/2024 COT - RSEL - Electrical Final Passed
04/08/2024 COT - RSEL - Outdoor Lighting Passed
04/08/2024 COT - RSME - Mechanical Final Passed
04/08/2024 COT - RSPL - Plumbing Final Passed
04/08/2024 RSBU - Building Final Passed
04/08/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA II 69 SIC-2023-10-18_V1.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 2 - LOT 69 START_V1.PDF DOCUMENTS VIEW