Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1023-01647
Permit Details
Apply Date:
11/30/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1740-130 T22-M0015
Permit Reviews
Permit Number - TC-MDP-1023-01647
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/01/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 12/07/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01647
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
12/01/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
12/01/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
12/01/2023 | Post-Tension Inspection Report is required. |
12/01/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-1023-01647
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Date | Description | Comments |
---|---|---|
10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01647
Permit Description: SFR BT1740-130 T22-M0015
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/14/2023 | COT - RSPL - Yard Water Line | Passed | 12/14/23: okay to cover AB required | |
12/14/2023 | COT - RSPL - Sewer | Passed | ||
12/14/2023 | COT - RSPL - Rough Soil | Passed | 12/14/23: okay to cover AB required | |
12/21/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/21/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
12/22/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-22-23: rebar reinforcement has been installed around tub boxes. Sub grade has been corrected to allow for the thicken slab at rear of home. Okay to pour concrete for footings and slab on grade. | |
12/22/2023 | COT - RSBU - Preslab | Passed | 12-22-23: rebar reinforcement has been installed around tub boxes. Sub grade has been corrected to allow for the thicken slab at rear of home. Okay to pour concrete for footings and slab on grade. | |
01/08/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | Exterior shear walls are sheathed and properly nailed. Anchor bolts are installed, all hurricane clips are secured with nails properly, and all trusses are secured with h2.5 clips. Okay to proceed with drying in exterior walls and roof. | |
01/08/2024 | COT - RSBU - Roof Nailing | Passed | Exterior shear walls are sheathed and properly nailed. Anchor bolts are installed, all hurricane clips are secured with nails properly, and all trusses are secured with h2.5 clips. Okay to proceed with drying in exterior walls and roof. | |
02/28/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
02/29/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/29/24: all corrections made | |
03/01/2024 | BULD - Electrical Clearance | Passed | TEP ECO | |
03/13/2024 | COT - RSBU - Interior Shear Bracing | Passed | Interior drywall in kitchen, bedroom #3, and master bedroom is properly installed and secured to studs. | |
05/02/2024 | COT - BULD - SWG Clearance | Passed | ||
05/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/15/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/15/2024 | ENGR Engineering Final | Passed | ||
05/15/2024 | RSBU - Building Progress | Passed | ||
05/16/2024 | COT - RSEL - Electrical Final | Passed | ||
05/16/2024 | COT - RSME - Mechanical Final | Passed | ||
05/16/2024 | RSBU - Building Final | Passed |