Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1023-01641
Permit Details
Apply Date:
10/17/2023
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062
Permit Reviews
Permit Number - TC-MDP-1023-01641
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/24/2023 | APPROVED |
01/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1023-01641
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date | Description | Comments |
---|---|---|
10/18/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
10/18/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
10/18/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/31/2024 | Post-Tension Inspection Report is required. | |
10/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/18/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/31/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01641
Permite Description: SFR MERI132021 T21-M0062
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/15/2024 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Properly secure condenser disconnect and brace whip, exterior outlet receptacles must be covered with weatherproof cover, laundry outlet receptacles must be gfci protected, exhaust in attic not working. |
05/15/2024 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Properly secure condenser disconnect and brace whip, exterior outlet receptacles must be covered with weatherproof cover, laundry outlet receptacles must be gfci protected, exhaust in attic not working. |
05/15/2024 | RSBU - Building Final | N/A | Re-inspection required | Properly secure condenser disconnect and brace whip, exterior outlet receptacles must be covered with weatherproof cover, laundry outlet receptacles must be gfci protected, exhaust in attic not working. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01641
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 21
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/18/2023 | COT - RSPL - Rough Soil | Passed | 12/18/23: underground plumbing is connected to main sewer and under water test. Okay to shade pipe and backfill trench. | |
12/18/2023 | COT - RSPL - Sewer | Passed | 12/18/23: Sewer line is connected to main sewer and under water test. Okay to shade pipe and backfill trench. | |
12/18/2023 | COT - RSPL - Yard Water Line | Passed | 12/18/23: Main water line is connected to the meter and fully under water pressure from City Water. | |
12/27/2023 | COT - RSEL - Electrical Underground | Passed | ||
12/27/2023 | COT - RSBU - Preslab | Passed | ||
12/27/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
12/27/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
01/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | ||
01/12/2024 | COT - RSBU - Roof Nailing | Passed | ||
02/09/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
02/09/2024 | BULD - Electrical Clearance | Passed | ||
02/09/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
02/29/2024 | COT - RSBU - Interior Shear Bracing | Passed | ||
02/29/2024 | RSBU - Building Progress | Passed | ||
04/12/2024 | COT - BULD - SWG Clearance | Passed | ||
05/15/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
05/15/2024 | COT - RSPL - Plumbing Final | Passed | ||
05/14/2024 | ENGR Engineering Final | Passed | ||
05/17/2024 | COT - RSEL - Electrical Final | Passed | ||
05/17/2024 | COT - RSME - Mechanical Final | Passed | ||
05/17/2024 | RSBU - Building Final | Passed |