Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/29/2023
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-1023-01640
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
07/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/22/2024 APPROVED Review Details
09/26/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 09/26/2024 APPROVED Review Details
12/29/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/04/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01640
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
12/29/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/29/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/02/2024 Post-Tension Inspection Report is required.
10/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/29/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/29/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01640
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/22/2024 COT - RSPL - Sewer Passed
04/22/2024 COT - RSPL - Rough Soil Passed
04/22/2024 COT - RSPL - Backwater Valve Passed
05/07/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/07/2024 COT - RSBU - Preslab Passed
05/07/2024 COT - RSEL - Electrical Underground Passed
05/07/2024 COT - RSEL - Grounding/Bonding Passed
05/30/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/30/2024 COT - RSBU - Roof Nailing Passed
06/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/17/2024 COT - RSPL - Gas Pressure Test Passed
06/17/2024 COT - RSPL - Yard Water Line Passed
06/26/2024 COT - RSBU - Interior Shear Bracing Passed Corrections were made. 6/26/2024
07/30/2024 BULD - Electrical Clearance Passed Clearance for TEP ECO. 7/30/2024
08/15/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/15/2024
08/29/2024 COT - RSEL - Electrical Final Passed
08/29/2024 COT - RSEL - Outdoor Lighting Passed
08/29/2024 COT - RSME - Mechanical Final Passed
08/29/2024 COT - RSPL - Plumbing Final Passed
08/29/2024 RSBU - Building Final Passed
08/29/2024 RSBU - Building Progress Passed
08/30/2024 ENGR Engineering Final Passed Move in ready

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
147400 PT LOT 158 COMPLETE-2024-07-18_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 158 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 158 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 158 SPECIAL INSPECTION CERTIFICATE-2023-12-29_V1.PDF DOCUMENTS VIEW