Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
12/29/2023
Applicant:
Daria Hopkins
Description:
SFR MERI132021 T21-M0062

Permit Reviews

Permit Number - TC-MDP-1023-01636
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Start Date Submittal Complete Date Status  
05/17/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/17/2024 APPROVED Review Details
12/29/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/04/2024 APPROVED Review Details
10/28/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 10/29/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01636
Permit Status: Complete
Permit Description: SFR MERI132021 T21-M0062
Date Description Comments
12/29/2023 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
12/29/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/29/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/02/2024 Post-Tension Inspection Report is required.
10/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/29/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/29/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
01/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01636
Permit Description: SFR MERI132021 T21-M0062
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/02/2024 COT - RSPL - Backwater Valve Passed 4/2/24: passed ok to backfill. Shading required
04/02/2024 COT - RSPL - Sewer Passed 4/2/24: plumbing underground per plans ok to backfill. Shading required.
04/02/2024 COT - RSPL - Rough Soil Passed 4/2/24: plumbing underground per plans ok to backfill. Shading required.
04/09/2024 COT - RSBU - Preslab Passed
04/09/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
04/09/2024 COT - RSEL - Electrical Underground Passed
04/09/2024 COT - RSEL - Grounding/Bonding Passed
04/23/2024 COT - RSBU - Exterior Clips/Sheathing Passed
05/30/2024 BULD - Electrical Clearance Passed
05/30/2024 COT - RSBU - Roof Nailing Passed
05/30/2024 COT - RSPL - Gas Pressure Test Passed
05/31/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/10/2024 COT - RSBU - Interior Shear Bracing Passed
08/06/2024 COT - BULD - SWG Clearance Passed Clearance for Southwest Gas. 8/6/2024
08/09/2024 COT - RSEL - Electrical Final Passed
08/09/2024 COT - RSEL - Outdoor Lighting Passed
08/09/2024 COT - RSME - Mechanical Final Passed
08/09/2024 COT - RSPL - Plumbing Final Passed
08/09/2024 COT - RSPL - Yard Water Line Passed
08/09/2024 RSBU - Building Final Passed
08/09/2024 RSBU - Building Progress Passed
08/15/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
146795 PT LOT 160 COMPLETE-2024-05-15_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 160 APPLICATION_V1.PDF DOCUMENTS VIEW
LOT 160 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 160 SPECIAL INSPECTION CERTIFICATE-2023-12-29_V1.PDF DOCUMENTS VIEW