Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1023-01613
Permit Details
Apply Date:
11/02/2023
Applicant:
Chelsea Marshall
Description:
NEW MODEL PLAN SFR RookBellevue A
Permit Reviews
Permit Number - TC-MDP-1023-01613
Permit Status: Inspections
Permit Description: NEW MODEL PLAN SFR RookBellevue A
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/03/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/16/2023 | APPROVED |
| 01/31/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01613
Permit Status: Inspections
Permit Description: NEW MODEL PLAN SFR RookBellevue A
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 06/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 06/29/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
| 11/03/2023 | Masonry Inspection Report submittal review is required. |
| 11/03/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 11/16/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01613
Permit Status: Inspections
Permit Description: NEW MODEL PLAN SFR RookBellevue A
| Date | Description | Comments |
|---|---|---|
| 06/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 11/03/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1023-01613
Permite Description: NEW MODEL PLAN SFR RookBellevue A
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | dry in buildng |
| 05/09/2025 | COT - RSEL - Outdoor Lighting | N/A | Partial Pass |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1023-01613
Permit Description: NEW MODEL PLAN SFR RookBellevue A
Total Completed Inspections - 13
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/18/2024 | COT - RSPL - Rough Soil | Passed | ||
| 07/18/2024 | COT - RSPL - Sewer | Passed | ||
| 07/25/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 07/25/2024 | COT - RSBU - Preslab | Passed | ||
| 07/25/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 07/25/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/01/2025 | PDSD Building Division - Unspecified In-Field | Passed | ||
| 04/01/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/02/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/09/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/09/2025 | RSBU - Building Progress | Passed | Lath | |
| 11/06/2025 | BULD - Electrical Clearance | Passed | Two meters for Units 19 and 20. ECO TEP |