Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1023-01608
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
1300 N ROOK AV BLDG 1
Address NEW:
1300 N ROOK AV BLDG 1
Apply Date:
10/16/2023
Applicant:
Chelsea Marshall
Description:
NEW MODEL PLAN SFR RookBellevue A Building 1
Permit Reviews
Permit Number - TC-MDP-1023-01608
Permit Status: Inspections
Permit Description: NEW MODEL PLAN SFR RookBellevue A Building 1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/25/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/25/2024 | APPROVED |
| 10/17/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/23/2023 | APPROVED |
| 11/29/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/30/2023 | REQUIRES RESUBMIT |
| 11/30/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 12/11/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01608
Permit Status: Inspections
Permit Description: NEW MODEL PLAN SFR RookBellevue A Building 1
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 06/08/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
| 06/29/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 12/04/2023 | Post-Installed Anchor Inspection Report is required. |
| 12/04/2023 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
| 12/04/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
| 12/04/2023 | SPECIAL INSPECTION FOR STRUCTURAL MASONRY IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01608
Permit Status: Inspections
Permit Description: NEW MODEL PLAN SFR RookBellevue A Building 1
| Date | Description | Comments |
|---|---|---|
| 11/28/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 11/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 06/29/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1023-01608
Permite Description: NEW MODEL PLAN SFR RookBellevue A Building 1
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/06/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 12/04/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 12/04/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-1023-01608
Permit Description: NEW MODEL PLAN SFR RookBellevue A Building 1
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/20/2024 | COT - RSPL - Rough Soil | Passed | Note: This building has two permits, though all the others have one. | |
| 08/20/2024 | COT - RSPL - Sewer | Passed | Note: This building has two permits, though all the others have one. | |
| 09/05/2024 | COT - RSBU - Preslab | Passed | ||
| 09/05/2024 | COT - RSEL - Electrical Underground | Passed | ||
| 09/05/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/29/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.29.25 A35's missing per plans at 2nd floor SW1 AND 3 require anchor bolts at 32 oc Shot pins missing throughout at interior |
|
| 12/04/2025 | BULD - Electrical Clearance | Passed | ECO TEP |
|
| 12/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 12/04/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 12/12/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 12/12/25 |