Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
12/07/2023
Applicant:
John Sutton
Description:
SFR LE23002 T22-M0057

Permit Reviews

Permit Number - TC-MDP-1023-01598
Permit Status: Inspections complete
Permit Description: SFR LE23002 T22-M0057
Start Date Submittal Complete Date Status  
12/07/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 12/13/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01598
Permit Status: Inspections complete
Permit Description: SFR LE23002 T22-M0057
Total Outstanding Activity Conditions - 5
Date Name
07/10/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
12/07/2023 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
12/07/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
12/07/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
12/11/2023 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-1023-01598
Permit Status: Inspections complete
Permit Description: SFR LE23002 T22-M0057
Date Description Comments
07/10/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/11/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01598
Permit Description: SFR LE23002 T22-M0057
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/22/2024 COT - RSPL - Rough Soil Passed
02/22/2024 COT - RSPL - Sewer Passed
02/22/2024 COT - RSPL - Yard Water Line Passed
03/01/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/01/2024 COT - RSBU - Preslab Passed
03/01/2024 COT - RSEL - Electrical Underground Passed
03/22/2024 COT - RSBU - Exterior Clips/Sheathing Passed Missing shot pins and anchor bolts throughout home will pass but check at intermediate
03/22/2024 COT - RSBU - Roof Nailing Passed
05/08/2024 COT - RSEL - Grounding/Bonding Passed
05/08/2024 COT - RSPL - Gas Pressure Test Passed
05/10/2024 BULD - Electrical Clearance Passed
05/10/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/21/2024 COT - RSBU - Interior Shear Bracing Passed
07/29/2024 COT - BULD - SWG Clearance Passed SWG for meter only
08/09/2024 COT - RSEL - Electrical Final Passed
08/09/2024 COT - RSEL - Outdoor Lighting Passed
08/09/2024 COT - RSME - Mechanical Final Passed
08/09/2024 COT - RSPL - Plumbing Final Passed
08/09/2024 RSBU - Building Final Passed
08/09/2024 RSBU - Building Progress Passed
08/16/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LEC 6 OK TO PERMIT_V1.PDF DOCUMENTS VIEW
LEC 6 SIC-2023-12-07_V1.PDF DOCUMENTS VIEW