Permit: TC-MDP-0926-00741
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
9936 E LEBARON DR
Address NEW:
9936 E LEBARON DR
Apply Date:
09/08/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013-140 (2024 IRC) (Model Master Plan TC-MDP-0626-00496) REV1: Added callouts on pipe sizing, sizing on the plumbing fixture’s ¼ turn angle stops, updated the Maximum Development Length to be 150’ and the Pressure Range to be 50 to 60 psi
Permit Reviews
Permit Number - TC-MDP-0926-00741
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013-140 (2024 IRC) (Model Master Plan TC-MDP-0626-00496)
REV1: Added callouts on pipe sizing, sizing on the plumbing fixture’s ¼ turn angle stops, updated the Maximum Development Length to be 150’ and the Pressure Range to be 50 to 60 psi
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/09/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/16/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0926-00741
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013-140 (2024 IRC) (Model Master Plan TC-MDP-0626-00496)
REV1: Added callouts on pipe sizing, sizing on the plumbing fixture’s ¼ turn angle stops, updated the Maximum Development Length to be 150’ and the Pressure Range to be 50 to 60 psi
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/04/2026 | Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 09/04/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/16/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0926-00741
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 2013-140 (2024 IRC) (Model Master Plan TC-MDP-0626-00496)
REV1: Added callouts on pipe sizing, sizing on the plumbing fixture’s ¼ turn angle stops, updated the Maximum Development Length to be 150’ and the Pressure Range to be 50 to 60 psi
| Date | Description | Comments |
|---|---|---|
| 09/04/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/04/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0926-00741
Permite Description: Mirador Ridge Skies 2013-140 (2024 IRC) (Model Master Plan TC-MDP-0626-00496)
REV1: Added callouts on pipe sizing, sizing on the plumbing fixture’s ¼ turn angle stops, updated the Maximum Development Length to be 150’ and the Pressure Range to be 50 to 60 psi
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/02/2026 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Partial pass. Pending point of connection to panel. 10/2/2026 |
| 10/13/2026 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 10/13/2026 Add washer plate to anchor bolt at primary bedroom at SW11 as marked. Add nails to loose panels in garage and at hallway as marked. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0926-00741
Permit Description: Mirador Ridge Skies 2013-140 (2024 IRC) (Model Master Plan TC-MDP-0626-00496)
REV1: Added callouts on pipe sizing, sizing on the plumbing fixture’s ¼ turn angle stops, updated the Maximum Development Length to be 150’ and the Pressure Range to be 50 to 60 psi
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | COT - RSPL - Yard Water Line | Passed | 9/24/26: main water line Verified under test-okay to backfill using shading materials. | |
| 09/24/2026 | COT - RSPL - Sewer | Passed | 9/24/26; sewer connection approved. Verified under test-ply to backfill using shading materials. | |
| 09/24/2026 | COT - RSPL - Rough Soil | Passed | 9/24/26: underground plumbing verified per plans and under test-okay to backfill using shading materials. | |
| 10/02/2026 | COT - RSEL - Electrical Underground | Passed | Conduit being placed at time of inspection. 10/2/2026 | |
| 10/06/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Approved. Corrections were made. Okay for concrete placement. 10/6/2026 | |
| 10/06/2026 | COT - RSBU - Preslab | Passed | Approved. Corrections were made. Okay for concrete placement. 10/6/2026 | |
| 10/14/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/14/2026 All corrections made. |
|
| 10/14/2026 | COT - RSBU - Roof Nailing | Passed | 10/14/2026 All corrections made. |