Permit: TC-MDP-0926-00730
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
7363 S PYRAMID RIDGE DR
Address NEW:
7363 S PYRAMID RIDGE DR
Apply Date:
09/03/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Blossom 230.2212 (2024 IRC) (Model Master Plan TC-MDP-0626-00482)
Permit Reviews
Permit Number - TC-MDP-0926-00730
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 230.2212 (2024 IRC) (Model Master Plan TC-MDP-0626-00482)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/08/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/16/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0926-00730
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 230.2212 (2024 IRC) (Model Master Plan TC-MDP-0626-00482)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/03/2026 | Prior to Final - Required Documents - Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. |
| 09/03/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/15/2026 | Prior to Final - Special Inspections - SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/15/2026 | Prior to Final - Required Documents - Post-Installed Anchor Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0926-00730
Permit Status: Inspections
Permit Description: Mirador Ridge Blossom 230.2212 (2024 IRC) (Model Master Plan TC-MDP-0626-00482)
| Date | Description | Comments |
|---|---|---|
| 09/03/2026 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/03/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0926-00730
Permite Description: Mirador Ridge Blossom 230.2212 (2024 IRC) (Model Master Plan TC-MDP-0626-00482)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2026 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Partial pass. Pending connection to panel. 10/5/2026 |
| 10/15/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | 10/15/2026 Add A35 clips to SW9 at walk in closet per detail 303A after roof is loaded, check at intermediates. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0926-00730
Permit Description: Mirador Ridge Blossom 230.2212 (2024 IRC) (Model Master Plan TC-MDP-0626-00482)
Total Completed Inspections - 8
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/24/2026 | COT - RSPL - Rough Soil | Passed | 9/24/26: underground plumbing together with sewer and main water line verified per plans and under test. Okay to backfill using shading materials. | |
| 09/24/2026 | COT - RSPL - Sewer | Passed | 9/24/26: underground plumbing together with sewer and main water line verified per plans and under test. Okay to backfill using shading materials. | |
| 09/24/2026 | COT - RSPL - Yard Water Line | Passed | 9/24/26: underground plumbing together with sewer and main water line verified per plans and under test. Okay to backfill using shading materials. | |
| 10/05/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 10/5/2026 approved. Corrections were completed. | |
| 10/05/2026 | COT - RSBU - Preslab | Passed | 10/5/2026 approved. Corrections were completed. | |
| 10/05/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 10/16/2026 | COT - RSBU - Roof Nailing | Passed | 10/16/2026 All corrections made. |
|
| 10/16/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10/16/2026 All corrections made. |