Permit: TC-MDP-0925-00556
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
5946 E BENBURB LN
Address NEW:
5946 E BENBURB LN
Apply Date:
12/19/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
Permit Reviews
Permit Number - TC-MDP-0925-00556
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/23/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 01/02/2026 | APPROVED |
| 01/02/2026 | ADMINISTRATIVE v.1 | 01/02/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0925-00556
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 09/18/2025 | Post-Tension Inspection Report is required. |
| 09/18/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 09/18/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Conditions
Permit Number - TC-MDP-0925-00556
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
| Date | Description | Comments |
|---|---|---|
| 09/18/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00556
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/02/2026 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 2/1/2026 | |
| 02/02/2026 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 2/1/2026 | |
| 02/02/2026 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 2/1/2026 | |
| 02/02/2026 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 2/1/2026 | |
| 02/06/2026 | BULD - Electrical Clearance | Passed | 2.6.26 Approved for eco |
|
| 02/06/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2.6.26 Approved |
|
| 02/06/2026 | COT - RSBU - Preslab | Passed | ||
| 02/06/2026 | COT - RSEL - Electrical Underground | Passed | 2.6.26 Approved |
|
| 02/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 2/23/26 | |
| 02/23/2026 | COT - RSBU - Roof Nailing | Passed | Passed 2/23/26 | |
| 03/10/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/10/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/20/2026 | COT - RSBU - Interior Shear Bracing | Passed | 3/20/2026 Approved per plan. |
|
| 04/22/2026 | COT - BULD - SWG Clearance | Passed | 04/22/2026 Clearance for Southwest Gas. |
|
| 04/28/2026 | COT - RSEL - Electrical Final | Passed | ||
| 04/28/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/28/2026 | COT - RSME - Mechanical Final | Passed | ||
| 04/28/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 04/28/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 04/28/2026 | RSBU - Building Final | Passed | ||
| 04/28/2026 | RSBU - Building Progress | Passed |