Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
5942 E BENBURB LN
Apply Date:
11/04/2025
Applicant:
Candis Benson
Description:
New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1

Permit Reviews

Permit Number - TC-MDP-0925-00555
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
Start Date Submittal Complete Date Status  
11/04/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/12/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0925-00555
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
Total Outstanding Activity Conditions - 2
Date Name
09/18/2025 Post-Tension Inspection Report is required.
09/18/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0925-00555
Permit Status: Inspections complete
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
Date Description Comments
09/18/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/18/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00555
Permit Description: New Residential Model Plan (Model master plan TC-MDP-1224-01414) Rev 1
Total Completed Inspections - 20
Date Description Inspector Results Comments
12/16/2025 COT - RSPL - Rough Soil Passed 12/16/2025
Approved. All fixtures present and holding under test - ok to backfill with shading materials.
12/16/2025 COT - RSPL - Sewer Passed 12/16/2025
Approved. Holding under test to HCS with backwater valve and green tracer wire - ok to backfill with shading materials.
12/16/2025 COT - RSPL - Yard Water Line Passed 12/16/2025
Approved. Holding under test to meter in trench with blue tracer wire - ok to backfill with shading materials.
12/23/2025 BULD - Electrical Clearance Passed 12/23/2025
Clearance TEP ECO. Verified added correct address number on metal tag.
12/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 12/23/2025
Approved per site plan, verified setbacks.
12/23/2025 COT - RSBU - Preslab Passed 12/23/2025
Approved per plan. Verified cleaned up footing trench to 12". Okay for concrete placement.
12/23/2025 COT - RSEL - Electrical Underground Passed
01/05/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 01/05/2026
Approved per plan.
01/05/2026 COT - RSBU - Roof Nailing Passed 01/05/2026
Approved per plan.
01/22/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1.22.26
Approved
01/22/2026 COT - RSPL - Gas Pressure Test Passed 1.22.26
Approved
02/02/2026 COT - RSBU - Interior Shear Bracing Passed
03/10/2026 COT - BULD - SWG Clearance Passed 03/10/2026
Approved clearance SWG.
03/18/2026 COT - RSEL - Electrical Final Passed
03/18/2026 COT - RSEL - Outdoor Lighting Passed
03/18/2026 COT - RSME - Mechanical Final Passed
03/18/2026 COT - RSPL - Plumbing Final Passed 03/18/2026
Verified installed trapped drainage to upstairs sinks.
03/18/2026 RSBU - Building Final Passed
03/18/2026 RSBU - Building Progress Passed
03/20/2026 ENGR Engineering Final Passed