Permit: TC-MDP-0925-00549
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
2467 S CAMPBELL AV UNIT 1
Address NEW:
2467 S CAMPBELL AV UNIT 1
Apply Date:
10/03/2025
Applicant:
Charles Corrales
Description:
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Permit Reviews
Permit Number - TC-MDP-0925-00549
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/18/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 02/25/2026 | APPROVED |
| 02/25/2026 | ADMINISTRATIVE v.1 | N/A | REQUIRES RESUBMIT |
| 10/06/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/04/2025 | REQUIRES RESUBMIT |
| 02/25/2026 | ADMINISTRATIVE v.2 | N/A | APPROVED |
| 12/09/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 12/19/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-0925-00549
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 09/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
| 09/15/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0925-00549
Permit Status: Inspections complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Date | Description | Comments |
|---|---|---|
| 09/15/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 10/20/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00549
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/05/2026 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 3/5/2026 | |
| 03/05/2026 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 3/5/2026 | |
| 03/06/2026 | COT - RSPL - Yard Water Line | Passed | 3-6-26: main water line approved. Okay to backfill using shading materials. | |
| 03/06/2026 | COT - RSBU - Preslab | Passed | 3-6-26: preslab, excavation/setbacks verified per plans. Okay for concrete placement. Note: verified UFER. |
|
| 03/25/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/26/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 03/26/2026 | COT - RSBU - Firewall/Fire Barrier/Firestop | Passed | ||
| 04/07/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4.7.26 Minor corrections made while on site Approved |
|
| 04/07/2026 | BULD - Electrical Clearance | Passed | 4.7.26 Approved for ECO on units 1 and 2 |
|
| 04/10/2026 | COT - RSBU - Interior Shear Bracing | Passed | 04/10/2026 Approved per plan, verified drywall and nail schedule and common firewall. |
|
| 08/03/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 08/03/2026 | RSBU - Building Final | Passed | ||
| 08/03/2026 | COT - RSME - Mechanical Final | Passed | ||
| 08/03/2026 | COT - RSEL - Electrical Final | Passed | ||
| 08/03/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/11/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 08/12/2026 | ENGR Engineering Final | Passed | Appropriate thresholds are installed, sewer clean-outs are cut to acceptable height, parking block pins are driven, exposed pvc is painted. Site is complete in accordance with approved plans. |