Permit: TC-MDP-0925-00531
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
7633 S BEST MATE PL
Address NEW:
7633 S BEST MATE PL
Apply Date:
09/04/2025
Applicant:
Helen Ormsby
Description:
Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
Permit Reviews
Permit Number - TC-MDP-0925-00531
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 12/22/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/12/2026 | APPROVED |
| 09/05/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/12/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0925-00531
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/04/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0925-00531
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
| Date | Description | Comments |
|---|---|---|
| 09/08/2025 | Post-Installed Anchor Inspection Report is required. | |
| 09/04/2025 | Post-Tension Inspection Report is required. | |
| 09/04/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/08/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 09/04/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00531
Permite Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2025 | RSBU - Building Progress | N/A | Not Ready | lath incomplete |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00531
Permit Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/10/2025 | COT - RSPL - Rough Soil | Passed | ||
| 10/10/2025 | COT - RSPL - Sewer | Passed | ||
| 11/14/2025 | BULD - Electrical Clearance | Passed | 11.14.2025 Clearance TEP ECO. |
|
| 11/14/2025 | COT - RSPL - Yard Water Line | Passed | 11.14.2025 Approved and under test to meter with tracer - ok to backfill. |
|
| 11/14/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11.14.2025 Approved per site plan. |
|
| 11/14/2025 | COT - RSBU - Preslab | Passed | 11.14.2025 Approved per site plan - ok for concrete placement. |
|
| 11/14/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 11/14/2025 | COT - RSEL - Grounding/Bonding | Passed | 11.14.2025 connection to main service panel. |
|
| 11/25/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 11.25.2025 Approved, added anchor bolts as marked. |
|
| 11/25/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 12/09/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12.9.25 Approved |
|
| 12/09/2025 | COT - RSPL - Gas Pressure Test | Passed | 12.9.25 Approved |
|
| 12/16/2025 | COT - RSBU - Interior Shear Bracing | Passed | 12/16/2025 Approved per plan. |
|
| 01/16/2026 | RSBU - Building Progress | Passed | ||
| 01/20/2026 | COT - BULD - SWG Clearance | Passed | 01/20/2026 Clearance for Southwest Gas. Correction made to 1/16/26 inspection. |
|
| 01/26/2026 | COT - RSEL - Electrical Final | Passed | Passed 1/26/26 | |
| 01/26/2026 | COT - RSEL - Outdoor Lighting | Passed | Passed 1/26/26 | |
| 01/26/2026 | COT - RSME - Mechanical Final | Passed | Passed 1/26/26 | |
| 01/26/2026 | COT - RSPL - Plumbing Final | Passed | Passed 1/26/26 | |
| 01/26/2026 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 01/26/2026 | RSBU - Building Final | Passed | Passed 1/26/26 |