Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0925-00527
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
615 E HELEN ST UNIT 2
Address NEW:
615 E HELEN ST UNIT 2
Apply Date:
09/03/2025
Applicant:
Amanda Gattenby
Description:
Roost ADU Model Plan (Model master plan TC-MDP-0223-00625)
Permit Reviews
Permit Number - TC-MDP-0925-00527
Permit Status: Inspections
Permit Description: Roost ADU Model Plan (Model master plan TC-MDP-0223-00625)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2025 | RESTAMP - RESIDENTIAL v.1 | 09/25/2025 | APPROVED |
| 09/24/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 09/24/2025 | APPROVED |
| 09/03/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 09/24/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0925-00527
Permit Status: Inspections
Permit Description: Roost ADU Model Plan (Model master plan TC-MDP-0223-00625)
| Date | Description | Comments |
|---|---|---|
| 09/03/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0925-00527
Permit Description: Roost ADU Model Plan (Model master plan TC-MDP-0223-00625)
Total Completed Inspections - 10
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/27/2025 | COT - RSPL - Rough Soil | Passed | 10/27/25 passed ok to backfill | |
| 10/27/2025 | COT - RSPL - Sewer | Passed | 10/27/25 passed ok to backfill | |
| 10/27/2025 | COT - RSPL - Yard Water Line | Passed | 10/27/25 passed ok to backfill | |
| 10/31/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/31/2025 | COT - RSBU - Preslab | Passed | ||
| 11/20/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/20/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 11/26/2025 | COT - RSEL - Grounding/Bonding | Passed | 11.26.25 approved |
|
| 11/26/2025 | BULD - Electrical Clearance | Passed | 11.26.25 approved for eco |
|
| 12/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed |