Permit: TC-MDP-0925-00525
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9973 E LEBARON DR
Address NEW:
9973 E LEBARON DR
Apply Date:
04/02/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Permit Reviews
Permit Number - TC-MDP-0925-00525
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/28/2026 | SPECIAL INSPECTION REVIEW v.1 | 08/31/2026 | APPROVED |
| 04/03/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 04/15/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0925-00525
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Date | Description | Comments |
|---|---|---|
| 09/02/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 04/03/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 04/03/2026 | Post-Installed Anchor Inspection Report is required. | |
| 09/02/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 04/03/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00525
Permite Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/05/2026 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 6-5-26: pressure test must be at 15 psi. Current psi at 12.5-reschedule inspection. |
| 06/05/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 6-5-26: not ready-roof not loaded. |
| 08/19/2026 | RSBU - Building Final | N/A | Partial Pass | 8-19-26 corrections have been made partial pass pending conditions |
| 08/14/2026 | ENGR Engineering Final | N/A | Partial Pass | Site is complete in accordance with approved plans. Unsatisfied conditions need complete before CofO. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00525
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/24/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 04/24/2026 | COT - RSPL - Rough Soil | Passed | 04/24/2026 Okay to backfill, shading required. |
|
| 05/05/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 5.5.26 Approved |
|
| 05/05/2026 | COT - RSBU - Preslab | Passed | 5.5.26 Approved |
|
| 05/05/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 05/14/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 05/18/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 06/05/2026 | COT - RSEL - Grounding/Bonding | Passed | 6-5-26: grounding/bonding approved. | |
| 06/09/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/11/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6.11.26 Approved |
|
| 06/22/2026 | COT - RSPL - Sewer | Passed | ||
| 06/24/2026 | BULD - Electrical Clearance | Passed | ||
| 06/24/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 08/06/2026 | COT - BULD - SWG Clearance | Passed | 8-6-26: okay to install gas meter-SWG clearance issued. | |
| 08/14/2026 | COT - RSEL - Electrical Final | Passed | 8-14-26: electrical final approved. | |
| 08/14/2026 | COT - RSEL - Outdoor Lighting | Passed | 8-14-26: outdoor lighting approved. | |
| 08/14/2026 | COT - RSPL - Backwater Valve | Passed | 8-14-26: backwater valve approved. | |
| 08/14/2026 | COT - RSPL - Plumbing Final | Passed | 8-14-26: plumbing final approved. | |
| 08/14/2026 | RSBU - Building Progress | Passed | ||
| 08/19/2026 | COT - RSME - Mechanical Final | Passed | ||
| 09/11/2026 | RSBU - Building Final | Passed | ||
| 09/11/2026 | ENGR Engineering Final | Passed |