Permit: TC-MDP-0925-00522
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9867 E NALA PEAK WY
Address NEW:
9867 E NALA PEAK WY
Apply Date:
03/09/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Permit Reviews
Permit Number - TC-MDP-0925-00522
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 07/29/2026 | SPECIAL INSPECTION REVIEW v.1 | 07/29/2026 | REQUIRES RESUBMIT |
| 07/30/2026 | SPECIAL INSPECTION REVIEW v.2 | 07/31/2026 | APPROVED |
| 03/12/2026 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 03/20/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0925-00522
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
| Date | Description | Comments |
|---|---|---|
| 09/02/2025 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 03/16/2026 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/02/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 03/16/2026 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/02/2025 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/02/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/02/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 03/16/2026 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00522
Permite Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/20/2026 | COT - BULD - SWG Clearance | N/A | Not Ready | Provide tall enough ladder to verify attic. 7/20/2026 |
| 08/05/2026 | RSBU - Building Final | N/A | Re-inspection required | 8-5-26 provide cover plate in primary bedroom for fan* threshold at garage entry should meet ADA requirements* pending conditions must be satisfied. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00522
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/07/2026 | COT - RSPL - Rough Soil | Passed | 04/07/2026 Holding under test, ok to pour. Shading material required. |
|
| 04/08/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 04/17/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 04/17/2026 | COT - RSBU - Preslab | Passed | 04/17/2026 Approved per plans and reinforcements. Okay to pour. |
|
| 04/17/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/17/2026 Approved per plans and reinforcements. Okay to pour. |
|
| 05/05/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 5.5.26 Approved |
|
| 05/05/2026 | COT - RSBU - Roof Nailing | Passed | 5.5.26 Approved |
|
| 05/27/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 05/27/2026 | COT - RSPL - Gas Pressure Test | Passed | ||
| 06/05/2026 | COT - RSEL - Grounding/Bonding | Passed | 6-5-26: grounding/bonding approved. | |
| 06/05/2026 | COT - RSBU - Interior Shear Bracing | Passed | 6-5-26: interior shear bracing approved. Okay to tape & texture. | |
| 06/22/2026 | COT - RSPL - Sewer | Passed | ||
| 06/22/2026 | BULD - Electrical Clearance | Passed | ||
| 07/23/2026 | COT - BULD - SWG Clearance | Passed | 7-23-26 SWG Clearance approved. | |
| 08/04/2026 | COT - RSEL - Electrical Final | Passed | ||
| 08/04/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/04/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 08/04/2026 | ENGR Engineering Final | Passed | ||
| 08/04/2026 | RSBU - Building Progress | Passed | ||
| 08/05/2026 | COT - RSME - Mechanical Final | Passed | 8-5-26: mechanical final approved. | |
| 08/10/2026 | RSBU - Building Final | Passed |