Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9867 E NALA PEAK WY
Apply Date:
03/09/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)

Permit Reviews

Permit Number - TC-MDP-0925-00522
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Start Date Submittal Complete Date Status  
07/29/2026 SPECIAL INSPECTION REVIEW v.1 07/29/2026 REQUIRES RESUBMIT Review Details
07/30/2026 SPECIAL INSPECTION REVIEW v.2 07/31/2026 APPROVED Review Details
03/12/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/20/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0925-00522
Permit Status: Inspections complete
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Date Description Comments
09/02/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
03/16/2026 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/02/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
03/16/2026 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/02/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/02/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/16/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00522
Permite Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
07/20/2026 COT - BULD - SWG Clearance N/A Not Ready Provide tall enough ladder to verify attic. 7/20/2026
08/05/2026 RSBU - Building Final N/A Re-inspection required 8-5-26 provide cover plate in primary bedroom for fan* threshold at garage entry should meet ADA requirements* pending conditions must be satisfied.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00522
Permit Description: Mirador Ridge Skies 2013 Plan (Model master plan TC-MDP-0825-00417)
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/07/2026 COT - RSPL - Rough Soil Passed 04/07/2026
Holding under test, ok to pour. Shading material required.
04/08/2026 COT - RSPL - Yard Water Line Passed
04/17/2026 COT - RSEL - Electrical Underground Passed
04/17/2026 COT - RSBU - Preslab Passed 04/17/2026
Approved per plans and reinforcements. Okay to pour.
04/17/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 04/17/2026
Approved per plans and reinforcements. Okay to pour.
05/05/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 5.5.26
Approved
05/05/2026 COT - RSBU - Roof Nailing Passed 5.5.26
Approved
05/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/27/2026 COT - RSPL - Gas Pressure Test Passed
06/05/2026 COT - RSEL - Grounding/Bonding Passed 6-5-26: grounding/bonding approved.
06/05/2026 COT - RSBU - Interior Shear Bracing Passed 6-5-26: interior shear bracing approved. Okay to tape & texture.
06/22/2026 COT - RSPL - Sewer Passed
06/22/2026 BULD - Electrical Clearance Passed
07/23/2026 COT - BULD - SWG Clearance Passed 7-23-26 SWG Clearance approved.
08/04/2026 COT - RSEL - Electrical Final Passed
08/04/2026 COT - RSEL - Outdoor Lighting Passed
08/04/2026 COT - RSPL - Plumbing Final Passed
08/04/2026 ENGR Engineering Final Passed
08/04/2026 RSBU - Building Progress Passed
08/05/2026 COT - RSME - Mechanical Final Passed 8-5-26: mechanical final approved.
08/10/2026 RSBU - Building Final Passed

Documents

File Name Document Type  
PT PACKET- MRS 178-2026-07-29_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 178 START_V1.PDF DOCUMENTS VIEW
MRS 178 SIC-2026-03-09_V1.PDF DOCUMENTS VIEW