Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
9828 E KIARA PEAK WY
Apply Date:
03/04/2026
Applicant:
Celina Rodriguez
Description:
Mirador Ridge Skies 1708 Plan (TC-MDP-0825-00416)

Permit Reviews

Permit Number - TC-MDP-0925-00500
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 1708 Plan (TC-MDP-0825-00416)
Start Date Submittal Complete Date Status  
07/28/2026 SPECIAL INSPECTION REVIEW v.1 07/29/2026 APPROVED Review Details
03/05/2026 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/17/2026 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0925-00500
Permit Status: Inspections
Permit Description: Mirador Ridge Skies 1708 Plan (TC-MDP-0825-00416)
Date Description Comments
09/02/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
09/02/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/02/2025 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
03/06/2026 Post-Installed Anchor Inspection Report is required.
03/06/2026 SPECIAL INSPECTION FOR REINFORCING STEEL AND/OR PRE-STRESSING TENDONS IS REQUIRED.
09/02/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/02/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
03/06/2026 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0925-00500
Permite Description: Mirador Ridge Skies 1708 Plan (TC-MDP-0825-00416)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
04/16/2026 COT - RSEL - Electrical Underground N/A Not Applicable
06/05/2026 COT - RSBU - Interior Shear Bracing N/A Re-inspection required 6-5-26: not ready- missing drywall at restrooms/ family room.
07/28/2026 ENGR Engineering Final N/A Not Ready Site is complete. Unsatisfied Conditions, needs submittals and approvals before passing.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0925-00500
Permit Description: Mirador Ridge Skies 1708 Plan (TC-MDP-0825-00416)
Total Completed Inspections - 20
Date Description Inspector Results Comments
04/07/2026 COT - RSPL - Backwater Valve Passed 04/07/2026
Holding under test in separate trench. Okay to backfill with shading required.
04/07/2026 COT - RSPL - Rough Soil Passed 04/07/2026
Holding under test in separate trench. Okay to backfill with shading required.
04/07/2026 COT - RSPL - Yard Water Line Passed 04/07/2026
Holding under test in separate trench. Okay to backfill with shading.
04/16/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 04/16/2026
Approved per plan and reinforcement. Okay to pour.
04/16/2026 COT - RSBU - Preslab Passed 04/16/2026
Approved per plan and reinforcement. Okay to pour.
05/11/2026 COT - RSBU - Roof Nailing Passed
05/12/2026 COT - RSEL - Grounding/Bonding Passed
05/14/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed corrections made
05/27/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/27/2026 COT - RSPL - Gas Pressure Test Passed
06/08/2026 COT - RSBU - Interior Shear Bracing Passed corrections made
06/22/2026 COT - RSPL - Sewer Passed
06/22/2026 BULD - Electrical Clearance Passed
07/15/2026 COT - BULD - SWG Clearance Passed 7-15-2026 SWG Clearance approved
07/28/2026 COT - RSEL - Outdoor Lighting Passed
07/28/2026 RSBU - Building Progress Passed
07/30/2026 COT - RSEL - Electrical Final Passed Corrections were made. 7/30/2026
07/30/2026 COT - RSME - Mechanical Final Passed Corrections were made. 7/30/2026
07/30/2026 COT - RSPL - Plumbing Final Passed Corrections were made. 7/30/2026
07/30/2026 RSBU - Building Final Passed All corrections were made. 7/30/2026

Documents

File Name Document Type  
FINAL SIC - MIRADOR RIDGE SKIES LOT 173-2026-07-21_V1.PDF DOCUMENTS VIEW
PT PACKET-MIRADOR RIDGE SKIES 173-2026-07-28_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD (SSRS).PDF DOCUMENTS VIEW
MIRADOR RIDGE - LOT 173 START_V1.PDF DOCUMENTS VIEW
MRS 173 SIC-2026-03-04_V1.PDF DOCUMENTS VIEW