Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
11/05/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)

Permit Reviews

Permit Number - TC-MDP-0924-01149
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Start Date Submittal Complete Date Status  
11/07/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01149
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Activity Conditions - 6
Date Name
09/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/07/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/07/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/07/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/07/2024 Post-Tension Inspection Report is required.
11/07/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0924-01149
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Date Description Comments
09/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/07/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01149
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/09/2025 RSBU - Building Final N/A Re-inspection required Driveway is being re done. Label disconnects to identify A/H. Trim plumbing in garage for future use. 5/9/2025

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01149
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/08/2025 COT - RSPL - Rough Soil Passed Piping and setbacks per plan, trench clean with backfill on site. Ok to backfill 1/8/25
01/08/2025 COT - RSPL - Sewer Passed Piping and setbacks per plan, trench clean with backfill on site. Ok to backfill
01/08/2025 COT - RSPL - Yard Water Line Passed Piping and setbacks per plan, trench clean with backfill on site. Ok to backfill 1/8/25
01/08/2025 COT - RSPL - Backwater Valve Passed Piping and setbacks per plan, trench clean with backfill on site. Ok to backfill 1/8/25
01/22/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/22/25 pass
01/22/2025 COT - RSEL - Electrical Underground Passed 1/22/25 pass
01/22/2025 COT - RSEL - Grounding/Bonding Passed 1/22/25 pass
01/23/2025 COT - RSBU - Preslab Passed 1/23/25 pass
02/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/20/25 pass
02/20/2025 COT - RSBU - Roof Nailing Passed 2/20/25 pass
03/11/2025 BULD - Electrical Clearance Passed 11 Mar 25
TEP CLEARANCE: ECO
03/11/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
03/11/2025 COT - RSPL - Gas Pressure Test Passed
03/25/2025 COT - RSBU - Interior Shear Bracing Passed Passed 3/25/25 ok to tape
05/05/2025 COT - BULD - SWG Clearance Passed Passed clearance SWG 5/5/25
05/09/2025 COT - RSEL - Outdoor Lighting Passed
05/09/2025 COT - RSEL - Electrical Final Passed
05/09/2025 COT - RSME - Mechanical Final Passed
05/09/2025 COT - RSPL - Plumbing Final Passed
05/09/2025 RSBU - Building Progress Passed
05/15/2025 RSBU - Building Final Passed 5/15/25
Pass
05/15/2025 ENGR Engineering Final Passed Site is in accordance with approved plans. CofO ready.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-11-05_V1.PDF DOCUMENTS VIEW