Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
05/05/2025
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)

Permit Reviews

Permit Number - TC-MDP-0924-01148
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Start Date Submittal Complete Date Status  
05/08/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 05/19/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01148
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Activity Conditions - 4
Date Name
05/09/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
05/09/2025 Post-Installed Anchor Inspection Report is required.
05/09/2025 Post-Tension Inspection Report is required.
09/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0924-01148
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Date Description Comments
09/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01148
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/06/2025 COT - RSPL - Sewer Passed
06/06/2025 COT - RSPL - Rough Soil Passed
06/06/2025 COT - RSPL - Yard Water Line Passed
06/17/2025 COT - RSBU - Preslab Passed 6/17/2025 approved. Corrections were made.
06/17/2025 COT - RSEL - Electrical Underground Passed
06/17/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 6/17/2025 approved. Corrections were made.
07/11/2025 COT - RSBU - Roof Nailing Passed Passed 7/11/25
07/11/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Passed 7/11/25
08/04/2025 COT - RSEL - Grounding/Bonding Passed
08/04/2025 COT - RSPL - Gas Pressure Test Passed
08/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Approved. 8/6/2025
08/18/2025 COT - RSBU - Interior Shear Bracing Passed 8-18-25: okay for tape & texture.
08/26/2025 BULD - Electrical Clearance Passed 8/26/25: ECO TEP CLEARANCE
10/07/2025 COT - BULD - SWG Clearance Passed
10/21/2025 COT - RSEL - Electrical Final Passed
10/21/2025 COT - RSEL - Outdoor Lighting Passed
10/21/2025 COT - RSME - Mechanical Final Passed
10/21/2025 COT - RSPL - Plumbing Final Passed
10/21/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
10/21/2025 RSBU - Building Final Passed
10/21/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-05-05_V1.PDF DOCUMENTS VIEW