Status:
Inspections Complete
Type:
Model Building Permit
Address:
12791 E TORTOISE POINTE DR
Address NEW:
12791 E TORTOISE POINTE DR
Apply Date:
05/05/2025
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Permit Reviews
Permit Number - TC-MDP-0924-01147
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2025 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 05/19/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01147
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 05/09/2025 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 05/09/2025 | Post-Installed Anchor Inspection Report is required. |
| 05/09/2025 | Post-Tension Inspection Report is required. |
| 09/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0924-01147
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
| Date | Description | Comments |
|---|---|---|
| 09/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01147
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/16/2025 | COT - RSBU - Preslab | N/A | Not Applicable | 6-16-25: not ready |
| 07/11/2025 | COT - RSBU - Roof Nailing | N/A | Partial Pass | Partial pass pending relocation of attic access to provide proper clearance |
| 11/04/2025 | RSBU - Building Final | N/A | Re-inspection required | 11.04.2025 Gas meter not set. |
| 11/04/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | 11.04.2025 Gas meter not set. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01147
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes (Model master plan TC-MDP-0123-00347)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/06/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 06/06/2025 | COT - RSPL - Rough Soil | Passed | ||
| 06/06/2025 | COT - RSPL - Yard Water Line | Passed | ||
| 06/06/2025 | COT - RSPL - Sewer | Passed | ||
| 06/18/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 6/18/2025 approved. Okay for concrete placement. | |
| 07/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Passed 7/11/25 | |
| 08/06/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 08/06/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 08/06/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 08/06/2025 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 8/6/2025 | |
| 08/15/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 8.15.25 Re walked house. Satisfactory corrections have been made throughout. |
|
| 08/25/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 11/03/2025 | COT - BULD - SWG Clearance | Passed | Passed 11/3/25 CLEARANCE SWG | |
| 11/04/2025 | COT - RSEL - Electrical Final | Passed | ||
| 11/04/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 11/04/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 11/04/2025 | RSBU - Building Progress | Passed | ||
| 11/05/2025 | RSBU - Building Final | Passed | 11.05.2025 Approved, gas meter in place and verified. |
|
| 11/05/2025 | COT - RSME - Mechanical Final | Passed | 11.05.2025 Approved, gas meter in place and verified. |
|
| 11/10/2025 | ENGR Engineering Final | Passed | meter is set, site is good. |