Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
09/27/2024
Applicant:
Brandon Kempel
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0924-01146
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
02/27/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 03/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01146
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 4
Date Name
03/05/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
03/05/2025 Post-Installed Anchor Inspection Report is required.
03/05/2025 Post-Tension Inspection Report is required.
09/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0924-01146
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
02/27/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01146
Permite Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
08/13/2025 ENGR Engineering Final N/A Not Ready 8/13/25
Areas of paint dumping in back yard need to cleaned.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01146
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
04/02/2025 COT - RSPL - Backwater Valve Passed Passed 4/2/25 ok to backfill
04/02/2025 COT - RSPL - Rough Soil Passed Passed 4/2/25 ok to backfill
04/02/2025 COT - RSPL - Sewer Passed Passed 4/2/25 ok to backfill
04/02/2025 COT - RSPL - Yard Water Line Passed Passed 4/2/25 ok to backfill
04/11/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
04/11/2025 COT - RSBU - Preslab Passed
04/11/2025 COT - RSEL - Electrical Underground Passed
05/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Corrections were made. 5/9/2025
05/09/2025 COT - RSBU - Roof Nailing Passed Corrections were made. 5/9/2025
05/30/2025 BULD - Electrical Clearance Passed 5-30-25: panel okay to be energized. ECO clearance issued to TEP.
05/30/2025 COT - RSEL - Grounding/Bonding Passed 5-30-25, approved
05/30/2025 COT - RSPL - Gas Pressure Test Passed 5-30-25, approved.
06/02/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
06/18/2025 COT - RSBU - Interior Shear Bracing Passed 6/18/2025 all corrections were made.
07/29/2025 COT - BULD - SWG Clearance Passed 7.29.25
Lines, sediment traps supports and shut offs verified
08/14/2025 COT - RSEL - Electrical Final Passed
08/14/2025 COT - RSEL - Outdoor Lighting Passed
08/14/2025 COT - RSME - Mechanical Final Passed
08/14/2025 COT - RSPL - Plumbing Final Passed
08/14/2025 RSBU - Building Final Passed
08/14/2025 RSBU - Building Progress Passed
08/14/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2025-02-26_V1.PDF DOCUMENTS VIEW