Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/07/2024
Applicant:
Andrea Flood
Description:
SFR RKF55F T21-M0087

Permit Reviews

Permit Number - TC-MDP-0924-01144
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
Start Date Submittal Complete Date Status  
10/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/10/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01144
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
Total Outstanding Activity Conditions - 6
Date Name
09/30/2024 Post-Tension Inspection Report is required.
09/30/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/10/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/10/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/10/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0924-01144
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
Date Description Comments
10/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/30/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01144
Permit Description: SFR RKF55F T21-M0087
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/12/2024 COT - RSPL - Sewer Passed 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials.
12/12/2024 COT - RSPL - Yard Water Line Passed 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials.
12/12/2024 COT - RSPL - Backwater Valve Passed 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials.
12/12/2024 COT - RSPL - Rough Soil Passed 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials.
01/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and hold downs per plan, ok to pour concrete 1/2/25
01/02/2025 COT - RSBU - Preslab Passed Rebar and hold downs per plan, ok to pour concrete 1/2/25
01/02/2025 COT - RSEL - Electrical Underground Passed Rebar and hold downs per plan, ok to pour concrete 1/2/25
01/02/2025 COT - RSEL - Grounding/Bonding Passed Rebar and hold downs per plan, ok to pour concrete 1/2/25
01/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/28/27 corrections have been made. Pass
01/28/2025 COT - RSBU - Roof Nailing Passed 1/28/27 corrections have been made. Pass
02/20/2025 BULD - Electrical Clearance Passed 2/20/25 approval for TEP ECO
02/20/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/20/25 pass
02/20/2025 COT - RSPL - Gas Pressure Test Passed 2/20/25 pass
03/07/2025 COT - RSBU - Interior Shear Bracing Passed 7 Mar 25
Pass
05/01/2025 COT - BULD - SWG Clearance Passed 5/1/25: SWG CLEARANCE
05/05/2025 COT - RSEL - Electrical Final Passed Passed 5/5/25
05/05/2025 COT - RSEL - Outdoor Lighting Passed Passed 5/5/25
05/05/2025 COT - RSME - Mechanical Final Passed Passed 5/5/25
05/05/2025 ENGR Engineering Final Passed Site is in accordance with plans.
05/05/2025 RSBU - Building Progress Passed Passed 5/5/25
05/08/2025 COT - RSPL - Plumbing Final Passed 5/8/25 corrections made
05/08/2025 RSBU - Building Final Passed 5/8/25 corrections made