Permit: TC-MDP-0924-01144
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12772 E TORTOISE POINTE DR
Address NEW:
12772 E TORTOISE POINTE DR
Apply Date:
10/07/2024
Applicant:
Andrea Flood
Description:
SFR RKF55F T21-M0087
Permit Reviews
Permit Number - TC-MDP-0924-01144
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/08/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/10/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01144
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/30/2024 | Post-Tension Inspection Report is required. |
| 09/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 10/10/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 10/10/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/10/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/10/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0924-01144
Permit Status: Inspections complete
Permit Description: SFR RKF55F T21-M0087
| Date | Description | Comments |
|---|---|---|
| 10/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01144
Permit Description: SFR RKF55F T21-M0087
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2024 | COT - RSPL - Sewer | Passed | 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials. | |
| 12/12/2024 | COT - RSPL - Yard Water Line | Passed | 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials. | |
| 12/12/2024 | COT - RSPL - Backwater Valve | Passed | 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials. | |
| 12/12/2024 | COT - RSPL - Rough Soil | Passed | 12-12-24, main water line, backwater valve, sewer connection, and underground plumbing all verified as per approved plans. Okay to backfill with shading materials. | |
| 01/02/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and hold downs per plan, ok to pour concrete 1/2/25 | |
| 01/02/2025 | COT - RSBU - Preslab | Passed | Rebar and hold downs per plan, ok to pour concrete 1/2/25 | |
| 01/02/2025 | COT - RSEL - Electrical Underground | Passed | Rebar and hold downs per plan, ok to pour concrete 1/2/25 | |
| 01/02/2025 | COT - RSEL - Grounding/Bonding | Passed | Rebar and hold downs per plan, ok to pour concrete 1/2/25 | |
| 01/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/28/27 corrections have been made. Pass | |
| 01/28/2025 | COT - RSBU - Roof Nailing | Passed | 1/28/27 corrections have been made. Pass | |
| 02/20/2025 | BULD - Electrical Clearance | Passed | 2/20/25 approval for TEP ECO | |
| 02/20/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2/20/25 pass | |
| 02/20/2025 | COT - RSPL - Gas Pressure Test | Passed | 2/20/25 pass | |
| 03/07/2025 | COT - RSBU - Interior Shear Bracing | Passed | 7 Mar 25 Pass |
|
| 05/01/2025 | COT - BULD - SWG Clearance | Passed | 5/1/25: SWG CLEARANCE | |
| 05/05/2025 | COT - RSEL - Electrical Final | Passed | Passed 5/5/25 | |
| 05/05/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 5/5/25 | |
| 05/05/2025 | COT - RSME - Mechanical Final | Passed | Passed 5/5/25 | |
| 05/05/2025 | ENGR Engineering Final | Passed | Site is in accordance with plans. | |
| 05/05/2025 | RSBU - Building Progress | Passed | Passed 5/5/25 | |
| 05/08/2025 | COT - RSPL - Plumbing Final | Passed | 5/8/25 corrections made | |
| 05/08/2025 | RSBU - Building Final | Passed | 5/8/25 corrections made |