Permit: TC-MDP-0924-01137
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6188 E CAMPOLINA TR
Address NEW:
6188 E CAMPOLINA TR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan
Permit Reviews
Permit Number - TC-MDP-0924-01137
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/27/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/03/2024 | APPROVED |
| 08/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2025 | APPROVED |
| 10/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/30/2025 | REQUIRES RESUBMIT |
| 10/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 11/03/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01137
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
| Date | Description | Comments |
|---|---|---|
| 10/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/26/2024 | Post-Tension Inspection Report is required. | |
| 10/04/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/04/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/02/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 10/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01137
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2025 | COT - RSPL - Rough Soil | Passed | 9.12.25 APPROVED |
|
| 09/12/2025 | COT - RSPL - Sewer | Passed | 9.12.25 APPROVED |
|
| 09/12/2025 | COT - RSPL - Yard Water Line | Passed | 9.12.25 APPROVED |
|
| 09/19/2025 | BULD - Electrical Clearance | Passed | 9.19.2025 Clearance for TEP ECO. |
|
| 09/19/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 9.19.2025 Verified per plan, okay for concrete placement. |
|
| 09/19/2025 | COT - RSBU - Preslab | Passed | 9.19.2025 Verified per plan, okay for concrete placement. |
|
| 09/19/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 09/19/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 09/30/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 9.3-.25 Minimum two anchor bolts on bottom plates at front columns where plate is 12" or greater Nails over penetrate throughout on belly band at rear of house |
|
| 09/30/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 10/13/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/23/2025 | COT - RSBU - Interior Shear Bracing | Passed | 10.23.2025 Approved per plan, completed drywall and added screws at missing areas. |
|
| 11/20/2025 | COT - BULD - SWG Clearance | Passed | 11.20.2025 Clearance Southwest Gas |
|
| 12/04/2025 | COT - RSEL - Electrical Final | Passed | 12.4.25 APPROVED |
|
| 12/04/2025 | COT - RSEL - Outdoor Lighting | Passed | 12.4.25 APPROVED |
|
| 12/04/2025 | COT - RSME - Mechanical Final | Passed | 12.4.25 APPROVED |
|
| 12/04/2025 | COT - RSPL - Plumbing Final | Passed | 12.4.25 APPROVED |
|
| 12/04/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 12/04/2025 | RSBU - Building Final | Passed | 12.4.25 APPROVED |
|
| 12/04/2025 | RSBU - Building Progress | Passed | 12.4.25 APPROVED |