Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Issued
Type:
Model Building Permit
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan

Permit Reviews

Permit Number - TC-MDP-0924-01135
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Start Date Submittal Complete Date Status  
09/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01135
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Total Outstanding Activity Conditions - 5
Date Name
09/26/2024 Post-Tension Inspection Report is required.
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/02/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/02/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/02/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0924-01135
Permit Status: Issued
Permit Description: Blackhawk H30D Model Plan
Date Description Comments
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/02/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 139 SIC-2024-09-26_V1.PDF DOCUMENTS VIEW
CONS-BHK 139 D1_V1.PDF DOCUMENTS VIEW