Permit: TC-MDP-0924-01133
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6175 E CAMPOLINA TR
Address NEW:
6175 E CAMPOLINA TR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
Permit Reviews
Permit Number - TC-MDP-0924-01133
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2025 | APPROVED |
| 02/20/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/24/2026 | APPROVED |
| 09/27/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/02/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01133
Permit Status: Inspections complete
Permit Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
| Date | Description | Comments |
|---|---|---|
| 10/01/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/01/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/26/2024 | Post-Tension Inspection Report is required. | |
| 10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/01/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 10/01/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01133
Permit Description: Blackhawk H30A Model Plan (Model master plan TC-MDP-0823-01432)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2025 | COT - RSPL - Rough Soil | Passed | 12/18/2025 Approved and all fixtures holding under test. Okay to backfill with shadings materials. |
|
| 12/18/2025 | COT - RSPL - Sewer | Passed | 12/18/2025 Approved and holding under test to HCS with green tracer. Okay to backfill with shadings materials. |
|
| 12/18/2025 | COT - RSPL - Yard Water Line | Passed | 12/18/2025 Approved and holding under test to meter with blue tracer. Okay to backfill with shadings materials. |
|
| 12/24/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/24/2025 Approved, verified setbacks. |
|
| 12/24/2025 | COT - RSBU - Preslab | Passed | 12/24/2025 Approved per plan. Okay for concrete placement. |
|
| 12/24/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 12/24/2025 | BULD - Electrical Clearance | Passed | 12/24/2025 Clearance to TEP ECO. |
|
| 12/24/2025 | COT - RSEL - Grounding/Bonding | Passed | 12/24/2025 Tied into MSP from two ground rods. |
|
| 01/21/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 01/22/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1.22.26 Corrections made, approved |
|
| 01/29/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/29/26 passed | |
| 01/29/2026 | COT - RSPL - Gas Pressure Test | Passed | 1/29/26 passed | |
| 02/06/2026 | COT - RSBU - Interior Shear Bracing | Passed | 2.6.26 Approved |
|
| 03/05/2026 | COT - BULD - SWG Clearance | Passed | 03/05/2026 Approved clearance for Southwest Gas. |
|
| 03/19/2026 | COT - RSEL - Electrical Final | Passed | ||
| 03/19/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/19/2026 | COT - RSME - Mechanical Final | Passed | ||
| 03/19/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 03/19/2026 | ENGR Engineering Final | Passed | ||
| 03/19/2026 | RSBU - Building Final | Passed | ||
| 03/19/2026 | RSBU - Building Progress | Passed |