Permit: TC-MDP-0924-01126
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9823 E GRAY HAWK DR
Address NEW:
9823 E GRAY HAWK DR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35G Model Plan
Permit Reviews
Permit Number - TC-MDP-0924-01126
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/06/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/10/2025 | APPROVED |
| 09/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01126
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0924-01126
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
| Date | Description | Comments |
|---|---|---|
| 10/02/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/26/2024 | Post-Tension Inspection Report is required. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/27/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01126
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | COT - RSPL - Backwater Valve | Passed | Piping per plan and holds pressure, ok to backfill 1/10/25 | |
| 01/10/2025 | COT - RSPL - Rough Soil | Passed | Piping per plan and holds pressure, ok to backfill 1/10/25 | |
| 01/10/2025 | COT - RSPL - Sewer | Passed | ||
| 01/10/2025 | COT - RSPL - Yard Water Line | Passed | Piping per plan and holds pressure, ok to backfill 1/10/25 | |
| 01/10/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 1/10/25 | |
| 01/17/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set into place, masa clips and shear wall hold downs are nailed to form per plan requirements, post tension cabling is evenly spaced and properly secured to forms,underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed per plan requirements, Ufer ground and 2 ground rods are installed in footing with a #4 bare copper wire connected to ground rods. Okay to pour concrete for footings and slab. | |
| 01/17/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set into place, masa clips and shear wall hold downs are nailed to form per plan requirements, post tension cabling is evenly spaced and properly secured to forms,underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed per plan requirements, Ufer ground and 2 ground rods are installed in footing with a #4 bare copper wire connected to ground rods. Okay to pour concrete for footings and slab. | |
| 01/17/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set into place, masa clips and shear wall hold downs are nailed to form per plan requirements, post tension cabling is evenly spaced and properly secured to forms,underground plumbing pipes are properly wrapped with foam, underground electrical for kitchen island is installed per plan requirements, Ufer ground and 2 ground rods are installed in footing with a #4 bare copper wire connected to ground rods. Okay to pour concrete for footings and slab. | |
| 01/28/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/28/25 pass | |
| 01/28/2025 | COT - RSBU - Roof Nailing | Passed | 1/28/25 pass | |
| 01/28/2025 | COT - RSEL - Grounding/Bonding | Passed | 1/28/25 | |
| 02/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2-13-25, residential intermediate inspection approved. Okay to continue with construction. | |
| 02/13/2025 | COT - RSPL - Gas Pressure Test | Passed | 2-13-25, gas pressure test approved | |
| 02/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear walls is properly attached to the studs per plan requirements for an interior shear wall. Okay to proceed with tape, texture, and paint. | |
| 04/07/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 4/7/25 | |
| 04/15/2025 | COT - RSEL - Electrical Final | Passed | 4-15-25, outdoor lighting, mechanical, and electrical inspections approved. | |
| 04/15/2025 | COT - RSEL - Outdoor Lighting | Passed | 4-15-25, outdoor lighting, mechanical, and electrical inspections approved. | |
| 04/15/2025 | COT - RSME - Mechanical Final | Passed | 4-15-25, outdoor lighting, mechanical, and electrical inspections approved. | |
| 04/15/2025 | RSBU - Building Progress | Passed | ||
| 04/16/2025 | ENGR Engineering Final | Passed | There is an unconnected bare blue wire sticking out of irrigation system/ hose bib junction at SE corner of house | |
| 04/16/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/16/25 | |
| 04/16/2025 | RSBU - Building Final | Passed | Passed final 4/16/25 |