Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0924-01125
Permit Details
Apply Date:
12/23/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Permit Reviews
Permit Number - TC-MDP-0924-01125
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
12/26/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 01/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01125
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
12/26/2024 | Post-Installed Anchor Inspection Report is required. |
12/26/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0924-01125
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Date | Description | Comments |
---|---|---|
12/26/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01125
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/15/2025 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to the city water meter and under street pressure with no leaks. | |
01/15/2025 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and connected to city sewer line. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
01/15/2025 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and connected to city sewer line. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches. | |
01/21/2025 | COT - RSEL - Grounding/Bonding | Passed | 1/21/25 pass. | |
01/21/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1/21/25 pass. | |
01/21/2025 | COT - RSBU - Preslab | Passed | 1/21/25 pass. | |
01/21/2025 | COT - RSEL - Electrical Underground | Passed | 1/21/25 pass. | |
02/04/2025 | COT - RSBU - Exterior Clips/Sheathing | Passed | Anchor bolts and shop pins at marked areas, sister damaged stud in kitchen near island window, marked. 2/4/25 | |
02/05/2025 | COT - RSBU - Roof Nailing | Passed | 2-5-25, required corrections made. Okay to continue with construction. |