Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
12/23/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)

Permit Reviews

Permit Number - TC-MDP-0924-01125
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Start Date Submittal Complete Date Status  
12/26/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01125
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Outstanding Activity Conditions - 3
Date Name
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/26/2024 Post-Installed Anchor Inspection Report is required.
12/26/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0924-01125
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Date Description Comments
12/26/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01125
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/15/2025 COT - RSPL - Yard Water Line Passed Main water line is connected to the city water meter and under street pressure with no leaks.
01/15/2025 COT - RSPL - Sewer Passed Underground plumbing is complete and connected to city sewer line. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
01/15/2025 COT - RSPL - Rough Soil Passed Underground plumbing is complete and connected to city sewer line. Entire system is under a water test with no leaks. Okay to shade pipes and backfill trenches.
01/21/2025 COT - RSEL - Grounding/Bonding Passed 1/21/25 pass.
01/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1/21/25 pass.
01/21/2025 COT - RSBU - Preslab Passed 1/21/25 pass.
01/21/2025 COT - RSEL - Electrical Underground Passed 1/21/25 pass.
02/04/2025 COT - RSBU - Exterior Clips/Sheathing Passed Anchor bolts and shop pins at marked areas, sister damaged stud in kitchen near island window, marked. 2/4/25
02/05/2025 COT - RSBU - Roof Nailing Passed 2-5-25, required corrections made. Okay to continue with construction.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 61 START_V1.PDF DOCUMENTS VIEW
BTIII 61 SIC-2024-12-23_V1.PDF DOCUMENTS VIEW