Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
10/31/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-0924-01123
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
10/31/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/19/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01123
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 4
Date Name
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
11/04/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
11/04/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
11/04/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0924-01123
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Date Description Comments
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01123
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
01/02/2025 COT - RSPL - Yard Water Line N/A Re-inspection required Needs main water line connection or air test
01/02/2025 COT - RSPL - Rough Soil N/A Re-inspection required Needs main water line connection or air test
01/02/2025 COT - RSPL - Sewer N/A Re-inspection required Needs main water line connection or air test
01/14/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 1-14-25, partial pass for ufer only.
01/24/2025 COT - RSBU - Roof Nailing N/A Partial Pass 1/24/25 partial pass. Contractor needs to finish placing anchor bolts.
01/24/2025 COT - RSBU - Exterior Clips/Sheathing N/A Partial Pass 1/24/25 partial pass. Contractor needs to finish placing anchor bolts.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01123
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/06/2025 COT - RSPL - Rough Soil Passed 1/6/25: Underground plumbing is complete and connected to main sewer line. Entire system is under a water test with no leaks.
01/06/2025 COT - RSPL - Sewer Passed 1/6/25: Underground plumbing is complete and connected to main sewer line. Entire system is under a water test with no leaks.
01/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1-14-25, excavation/setbacks approved.
01/14/2025 COT - RSBU - Preslab Passed 1-14-25, preslab approved. Okay to pour concrete.
01/14/2025 COT - RSEL - Electrical Underground Passed
01/27/2025 COT - RSBU - Roof Nailing Passed 1/27/25 pass
01/27/2025 COT - RSBU - Exterior Clips/Sheathing Passed 1/27/25 corrections have been made, pass

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 48 START_V1.PDF DOCUMENTS VIEW
BTIII 48 SIC-2024-10-31_V1.PDF DOCUMENTS VIEW