Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/19/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600

Permit Reviews

Permit Number - TC-MDP-0924-01096
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Start Date Submittal Complete Date Status  
06/20/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/24/2025 APPROVED Review Details
01/15/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/23/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01096
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
Date Description Comments
01/15/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/15/2025 Post-Tension Inspection Report is required.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/15/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01096
Permite Description: Single Family Residence Plan 130.1600
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/02/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 5-2-25, partial for UFER only.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01096
Permit Description: Single Family Residence Plan 130.1600
Total Completed Inspections - 21
Date Description Inspector Results Comments
04/23/2025 COT - RSPL - Yard Water Line Passed 4-23-25, main water line approved. Okay to backfill with shading materials.
04/24/2025 COT - RSPL - Rough Soil Passed 4-24-25, underground plumbing verified per plans-okay to backfill with shading materials.
04/24/2025 COT - RSPL - Sewer Passed 4-24-25, sewer connection approved. Okay to backfill with shading materials.
05/01/2025 COT - RSEL - Electrical Underground Passed
05/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 5-2-25, preslab, excavation/rebar, setbacks approved. Okay to pour concrete.
05/02/2025 COT - RSBU - Preslab Passed 5-2-25, preslab, excavation/rebar, setbacks approved. Okay to pour concrete.
05/14/2025 COT - RSBU - Roof Nailing Passed
05/16/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
05/23/2025 COT - RSEL - Grounding/Bonding Passed 5/23/25 passed
05/23/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/23/25
05/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5-28-25, intermediates approved.
06/09/2025 COT - RSBU - Interior Shear Bracing Passed 6-9-25: interior shear bracing approved. Okay for tape & texture.
06/23/2025 BULD - Electrical Clearance Passed 6/23/2025 clearance for TEP ECO.
07/24/2025 COT - BULD - SWG Clearance Passed CLEARANCE SWG 7/17/25
07/24/2025 COT - RSEL - Electrical Final Passed
07/24/2025 COT - RSEL - Outdoor Lighting Passed
07/24/2025 RSBU - Building Progress Passed
07/25/2025 COT - RSME - Mechanical Final Passed 7/25/25
Pass
07/25/2025 ENGR Engineering Final Passed Grade looks good, is certified and numbers provided. Everything else is good, in accordance with approved plans.
07/25/2025 COT - RSPL - Plumbing Final Passed
07/25/2025 RSBU - Building Final Passed 7/25/25
Pass

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
154851 PT LOT 91 COMPLETE-2025-06-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 91 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 91 SPECIAL INSPECTION CERTIFICATE-2025-01-06_V1.PDF DOCUMENTS VIEW