Permit: TC-MDP-0924-01095
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6794 E VIA DEL CANTILLO
Address NEW:
6794 E VIA DEL CANTILLO
Apply Date:
10/21/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 130.1600
Permit Reviews
Permit Number - TC-MDP-0924-01095
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/24/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/08/2024 | APPROVED |
| 04/23/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/24/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01095
Permit Status: Complete
Permit Description: Single Family Residence Plan 130.1600
| Date | Description | Comments |
|---|---|---|
| 11/08/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/28/2024 | Post-Tension Inspection Report is required. | |
| 09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/28/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01095
Permite Description: Single Family Residence Plan 130.1600
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Partial pass for ufer, check connection at electrical clearance |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01095
Permit Description: Single Family Residence Plan 130.1600
Total Completed Inspections - 21