Permit: TC-MDP-0924-01091
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6797 E PASEO DON OCTAVIO
Address NEW:
6797 E PASEO DON OCTAVIO
Apply Date:
09/21/2024
Applicant:
Dana Petty
Description:
Single Family Residence plan 230.2690
Permit Reviews
Permit Number - TC-MDP-0924-01091
Permit Status: Complete
Permit Description: Single Family Residence plan 230.2690
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/01/2024 | APPROVED |
| 02/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/15/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01091
Permit Status: Complete
Permit Description: Single Family Residence plan 230.2690
| Date | Description | Comments |
|---|---|---|
| 10/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/26/2024 | Post-Tension Inspection Report is required. | |
| 09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01091
Permite Description: Single Family Residence plan 230.2690
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | second floor lathe not complete, no fire foam or calking at house |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01091
Permit Description: Single Family Residence plan 230.2690
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2024 | COT - RSPL - Yard Water Line | Passed | Piping holds water, no leaks. Tracer wire on main water line, install per plan. Ok to backfill 12/18/24 | |
| 12/18/2024 | COT - RSPL - Sewer | Passed | Piping holds water, no leaks. Tracer wire on main water line, install per plan. Ok to backfill 12/18/24 | |
| 12/18/2024 | COT - RSPL - Rough Soil | Passed | Piping holds water, no leaks. Tracer wire on main water line, install per plan. Ok to backfill 12/18/24 | |
| 12/31/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and tie downs per plans ok to pour concrete 12/31/24 | |
| 12/31/2024 | COT - RSBU - Preslab | Passed | Rebar and tie downs per plans ok to pour concrete 12/31/24 | |
| 12/31/2024 | COT - RSEL - Electrical Underground | Passed | Rebar and tie downs per plans ok to pour concrete 12/31/24 | |
| 12/31/2024 | COT - RSEL - Grounding/Bonding | Passed | Rebar and tie downs per plans ok to pour concrete 12/31/24 | |
| 01/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/14/25 issues fixed while on site, framing per plans. Ok to proceed | |
| 01/14/2025 | COT - RSBU - Roof Nailing | Passed | 1/14/25 issues fixed while on site, framing per plans. Ok to proceed | |
| 02/03/2025 | BULD - Electrical Clearance | Passed | Ready for temp power 2/3/25 CLEARANCE ECO | |
| 02/03/2025 | COT - RSPL - Gas Pressure Test | Passed | held pressure 2/3/25 | |
| 02/12/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed interior shear 2/12/25 | |
| 03/21/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 3/21/25 | |
| 04/02/2025 | COT - RSEL - Electrical Final | Passed | ||
| 04/02/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/02/2025 | COT - RSME - Mechanical Final | Passed | ||
| 04/02/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 04/02/2025 | ENGR Engineering Final | Passed | Site is good. CO ready. | |
| 04/02/2025 | RSBU - Building Final | Passed | ||
| 04/02/2025 | RSBU - Building Progress | Passed |