Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/23/2024
Applicant:
Dana Petty
Description:
Single Family Residence plan 230.2690

Permit Reviews

Permit Number - TC-MDP-0924-01086
Permit Status: Complete
Permit Description: Single Family Residence plan 230.2690
Start Date Submittal Complete Date Status  
03/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/14/2025 REQUIRES RESUBMIT Review Details
04/17/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 04/21/2025 APPROVED Review Details
09/25/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/01/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01086
Permit Status: Complete
Permit Description: Single Family Residence plan 230.2690
Date Description Comments
03/25/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/01/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/27/2024 Post-Tension Inspection Report is required.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01086
Permite Description: Single Family Residence plan 230.2690
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
05/06/2025 COT - RSEL - Electrical Final N/A Partial Pass Provide ko seal at panel. Provide label labeling for non metallic plumbing. Irrigation line leaking at hose bib. Extend A.A.V above 4”. Coat all exterior pipes. 5/6/2025
05/06/2025 COT - RSPL - Plumbing Final N/A Partial Pass Provide ko seal at panel. Provide label labeling for non metallic plumbing. Irrigation line leaking at hose bib. Extend A.A.V above 4”. Coat all exterior pipes. 5/6/2025
05/06/2025 RSBU - Building Final N/A Partial Pass Provide ko seal at panel. Provide label labeling for non metallic plumbing. Irrigation line leaking at hose bib. Extend A.A.V above 4”. Coat all exterior pipes. 5/6/2025

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01086
Permit Description: Single Family Residence plan 230.2690
Total Completed Inspections - 21
Date Description Inspector Results Comments
01/28/2025 COT - RSPL - Rough Soil Passed
01/28/2025 COT - RSPL - Sewer Passed
01/28/2025 COT - RSPL - Yard Water Line Passed
02/03/2025 COT - RSBU - Preslab Passed Rebar and tie downs per plan, ok to pour concrete 2/3/25
02/03/2025 COT - RSEL - Electrical Underground Passed Rebar and tie downs per plan, ok to pour concrete 2/3/25 electrical piping in place
02/03/2025 COT - RSEL - Grounding/Bonding Passed Rebar and tie downs per plan, ok to pour concrete 2/3/25
02/03/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Rebar and tie downs per plan, ok to pour concrete 2/3/25 electrical piping in place
02/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 24 FEB 25
1. CORRECTIONS MADE.
03/06/2025 BULD - Electrical Clearance Passed 6 Mar 25
TEP CLEARANCE: ECO
03/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6 Mar 25
Pass
03/06/2025 COT - RSPL - Gas Pressure Test Passed 6 Mar 25
Pass
03/19/2025 COT - RSBU - Roof Nailing Passed
03/19/2025 COT - RSBU - Interior Shear Bracing Passed
04/18/2025 COT - BULD - SWG Clearance Passed 4/18/25
SOUTHWEST GAS CLEARANCE: SWG
05/06/2025 COT - RSEL - Outdoor Lighting Passed
05/06/2025 COT - RSME - Mechanical Final Passed
05/06/2025 RSBU - Building Progress Passed
05/08/2025 COT - RSEL - Electrical Final Passed
05/08/2025 COT - RSPL - Plumbing Final Passed
05/08/2025 ENGR Engineering Final Passed
05/08/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
153212 PT LOT 81 COMPLETE WITH EPOXY-2025-04-15_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 81 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 81 SPECIAL INSPECTION CERTIFICATE-2024-09-23_V1.PDF DOCUMENTS VIEW