Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/19/2024
Applicant:
Dana Petty
Description:
Single Family Residence plan 130.1460

Permit Reviews

Permit Number - TC-MDP-0924-01074
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460
Start Date Submittal Complete Date Status  
07/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 07/28/2025 APPROVED Review Details
03/14/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 03/28/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01074
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460
Date Description Comments
03/14/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01074
Permit Description: Single Family Residence plan 130.1460
Total Completed Inspections - 21
Date Description Inspector Results Comments
06/11/2025 COT - RSPL - Rough Soil Passed 6-11-25: main water line, sewer connection, and underground plumbing approved. Okay to backfill with shading materials.
06/11/2025 COT - RSPL - Sewer Passed 6-11-25: main water line, sewer connection, and underground plumbing approved. Okay to backfill with shading materials.
06/11/2025 COT - RSPL - Yard Water Line Passed 6-11-25: main water line, sewer connection, and underground plumbing approved. Okay to backfill with shading materials.
06/17/2025 COT - RSEL - Electrical Underground Passed
06/18/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
06/18/2025 COT - RSBU - Preslab Passed
06/30/2025 COT - RSBU - Roof Nailing Passed
07/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Corrections were made. 7/3/2025
07/09/2025 COT - RSEL - Grounding/Bonding Passed 7-9-25: approved
07/11/2025 BULD - Electrical Clearance Passed 7-11-25: panel okay to be energized. ECO clearance sent to TEP.
07/15/2025 COT - RSPL - Gas Pressure Test Passed Passed 5/15/25
07/16/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Caulk and fire foam penetrations through, add blocking to Pex lines within 12 inches or recessed can lights

7.15.25
Satisfactory corrections made.
07/24/2025 COT - RSBU - Interior Shear Bracing Passed 7.24.25
Fastener shear walls meets schedule as per plan. General fasteners also verified throughout. Ok to proceed
08/29/2025 COT - BULD - SWG Clearance Passed 8.29.2025
Clearance for SW Gas.
09/08/2025 COT - RSEL - Electrical Final Passed 9.8.25
Approved
09/08/2025 COT - RSEL - Outdoor Lighting Passed 9.8.25
Approved
09/08/2025 COT - RSME - Mechanical Final Passed 9.8.25
Approved
09/08/2025 COT - RSPL - Plumbing Final Passed 9.8.25
Approved
09/08/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
09/08/2025 RSBU - Building Final Passed 9.8.25
Approved
09/08/2025 RSBU - Building Progress Passed 9.8.25
Approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
155562 PT LOT 100 COMPLETE-2025-07-23_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 100 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 100 SPECIAL INSPECTION CERTIFICATE-2025-03-13_V1.PDF DOCUMENTS VIEW