Permit: TC-MDP-0924-01065
Permit Details
Apply Date:
09/19/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 230.2380
Permit Reviews
Permit Number - TC-MDP-0924-01065
Permit Status: Issued
Permit Description: Single Family Residence Plan 230.2380
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/24/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/01/2024 | APPROVED |
01/15/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/15/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01065
Permit Status: Issued
Permit Description: Single Family Residence Plan 230.2380
Date | Description | Comments |
---|---|---|
10/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
09/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
09/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
09/26/2024 | Post-Tension Inspection Report is required. | |
09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
09/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
09/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Issued
Permit Number: TC-MDP-0924-01065
Permit Description: Single Family Residence Plan 230.2380
Total Completed Inspections - 13
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/26/2024 | COT - RSPL - Sewer | Passed | 11-26-24, sewer connection, main water line, and under ground plumbing approved. Okay to backfill. | |
11/26/2024 | COT - RSPL - Rough Soil | Passed | 11-26-24, sewer connection, main water line, and under ground plumbing approved. Okay to backfill. | |
11/26/2024 | COT - RSPL - Yard Water Line | Passed | 11-26-24, approved | |
12/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-4-24, excavation/rebar/setbacks, electrical underground,bonding, preslab verified as per approved plans. Okay to pour concrete. | |
12/04/2024 | COT - RSBU - Preslab | Passed | 12-4-24, preslab verified as per approved plans. Okay to pour concrete. | |
12/04/2024 | COT - RSEL - Electrical Underground | Passed | 12-4-24, excavation/rebar/setbacks, electrical underground,bonding, preslab verified as per approved plans. Okay to pour concrete. | |
12/04/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-4-24, excavation/rebar/setbacks, electrical underground,bonding, preslab verified as per approved plans. Okay to pour concrete. | |
12/23/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 12/23/24 corrections made | |
12/23/2024 | COT - RSBU - Roof Nailing | Passed | 12/23/24 corrections made | |
01/09/2025 | BULD - Electrical Clearance | Passed | Ready for temp power clearance ECO 1/9/25 | |
01/09/2025 | COT - RSPL - Gas Pressure Test | Passed | Held pressure 1/9/25 | |
01/13/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/13/25 corrections made | |
01/24/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/24/25 pass |