Permit Reviews
Permit Number - TC-MDP-0924-01063
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/01/2024 | APPROVED |
| 08/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/06/2025 | APPROVED |
| 04/21/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01063
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
| Date | Description | Comments |
|---|---|---|
| 09/19/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/26/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/26/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/19/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/26/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01063
Permite Description: Blackhawk T933 - Beech
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2025 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | 1/28/25 Same notes from above. North wall is still missing a stud |
| 04/03/2025 | COT - RSEL - Outdoor Lighting | N/A | Canceled | 3 April 25 Canceled by Brian. |
| 04/03/2025 | COT - RSME - Mechanical Final | N/A | Canceled | |
| 04/03/2025 | COT - RSPL - Plumbing Final | N/A | Canceled | |
| 04/03/2025 | COT - BULD - SWG Clearance | N/A | Canceled | 3 April 25 Canceled by Brian. |
| 04/03/2025 | COT - RSEL - Electrical Final | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01063
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/13/2024 | COT - RSPL - Backwater Valve | Passed | 11-13-24, underground plumbing, setbacks,main water line, sewer connection,backflow valve, & electrical underground all verified as per approved plans. Okay to backfill-provide shading. | |
| 11/13/2024 | COT - RSPL - Rough Soil | Passed | 11-13-24, underground plumbing, setbacks,main water line, sewer connection,backflow valve, & electrical underground all verified as per approved plans. Okay to backfill-provide shading. | |
| 11/13/2024 | COT - RSPL - Sewer | Passed | 11-13-24, underground plumbing, setbacks,main water line, sewer connection,backflow valve, & electrical underground all verified as per approved plans. Okay to backfill-provide shading. | |
| 11/13/2024 | COT - RSPL - Yard Water Line | Passed | 11-13-24, underground plumbing, setbacks,main water line, backflow valve, & electrical underground all verified as per approved plans. Okay to backfill-provide shading. | |
| 11/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-20-24, rebar/setbacks verified per approved plans. Okay to pour concrete. | |
| 11/20/2024 | COT - RSEL - Electrical Underground | Passed | 11-20-24, preslab, electrical underground,rebar/setbacks verified per approved plans. Okay to pour concrete. | |
| 11/20/2024 | COT - RSBU - Preslab | Passed | 11-20-24, preslab, electrical underground,rebar/setbacks verified per approved plans. Okay to pour concrete. | |
| 12/05/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12-5-24, exterior clips/sheathing together with roof nailing and truss bracing approved. Okay to continue with construction. | |
| 12/05/2024 | COT - RSBU - Roof Nailing | Passed | 12-5-24, roof nailing and truss bracing approved. Okay to continue with construction. | |
| 12/27/2024 | COT - RSPL - Gas Pressure Test | Passed | Passed 12/27/24 | |
| 12/27/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 12/27/24 | |
| 12/27/2024 | BULD - Electrical Clearance | Passed | Passed 12/27/24 CLEARANCE ECO | |
| 12/27/2024 | COT - RSEL - Grounding/Bonding | Passed | Passed 12/27/24 | |
| 02/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/29/25 passed by Thomas ok to proceed | |
| 02/21/2025 | RSBU - Building Progress | Passed | ||
| 04/07/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 04/07/2025 | COT - RSME - Mechanical Final | Passed | ||
| 04/07/2025 | COT - RSPL - Plumbing Final | Passed | 7 April 25 Pass |
|
| 04/10/2025 | COT - BULD - SWG Clearance | Passed | Clearance for Southwest Gas. 4/10/2025 | |
| 04/10/2025 | COT - RSEL - Electrical Final | Passed | Approved. 4/10/2025 | |
| 04/15/2025 | ENGR Engineering Final | Passed | ||
| 04/15/2025 | RSBU - Building Final | Passed | Passed, gas meter installed |