Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6090 E CAMPOLINA TR
Apply Date:
09/20/2024
Applicant:
Brian Jones
Description:
Blackhawk T933 - Beech

Permit Reviews

Permit Number - TC-MDP-0924-01062
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
Start Date Submittal Complete Date Status  
04/21/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/21/2025 APPROVED Review Details
09/24/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/01/2024 APPROVED Review Details
08/04/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/06/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01062
Permit Status: Complete
Permit Description: Blackhawk T933 - Beech
Date Description Comments
09/19/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/21/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/26/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/26/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/19/2024 Post-Tension Inspection Report is required.
09/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/26/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01062
Permit Description: Blackhawk T933 - Beech
Total Completed Inspections - 22
Date Description Inspector Results Comments
11/20/2024 COT - RSPL - Backwater Valve Passed 11-20-24, underground plumbing per approved plans. Setbacks verified together with sewer connection/backwater valve.Main water line not installed. Contractor will reschedule when ready. Plumbing okay to backfill.
11/20/2024 COT - RSPL - Rough Soil Passed 11-20-24, underground plumbing per approved plans. Setbacks verified together with sewer connection. Main water line not installed. Contractor will reschedule when ready. Plumbing okay to backfill.
11/20/2024 COT - RSPL - Sewer Passed 11-20-24, underground plumbing per approved plans. Setbacks verified together with sewer connection. Main water line not installed. Contractor will reschedule when ready. Plumbing okay to backfill.
11/22/2024 COT - RSPL - Yard Water Line Passed 11-22-24, main water line inspection approved. Okay to backfill.
12/04/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-4-24, excavation/rebar/setbacks and preslab verified as per approved plans. Okay to pour concrete.
12/04/2024 COT - RSBU - Preslab Passed 12-4-24, excavation/rebar/setbacks and preslab verified as per approved plans. Okay to pour concrete.
12/04/2024 COT - RSEL - Electrical Underground Passed 12-4-24, excavation/rebar/setbacks,electrical underground,and preslab verified as per approved plans. Okay to pour concrete.
12/18/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed Corrections made, no other issues present 12/18/24
12/18/2024 COT - RSBU - Roof Nailing Passed 12/18/24 corrections made, no additional issues found
01/15/2025 COT - RSPL - Gas Pressure Test Passed Passed 1/15/25
01/15/2025 BULD - Electrical Clearance Passed Ready for temp power CLEARANCE ECO
01/15/2025 COT - RSEL - Grounding/Bonding Passed Passed 1/15/25
01/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/22/25 pass
02/07/2025 COT - RSBU - Interior Shear Bracing Passed Passed interior shear inspection 2/7/25 ok to tape
03/03/2025 RSBU - Building Progress Passed
04/14/2025 COT - BULD - SWG Clearance Passed 04/14/25
SOUTHWEST GAS CLEARANCE: SWG
04/14/2025 COT - RSEL - Outdoor Lighting Passed
04/14/2025 COT - RSME - Mechanical Final Passed
04/14/2025 COT - RSPL - Plumbing Final Passed
04/22/2025 ENGR Engineering Final Passed
04/22/2025 COT - RSEL - Electrical Final Passed 4-22-25, electrical & building final approved.
04/22/2025 RSBU - Building Final Passed 4-22-25, electrical & building final approved.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
LOT 7508012025-2025-07-31_V1.PDF DOCUMENTS VIEW
11184 ALL PLANS-EPOXY ANCHOR SPECIAL INSPECTION-LETTER-2025-04-17_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BLACKHAWK RANCH LOT 75 START_09.11.24_V1.PDF DOCUMENTS VIEW
BLACKHAWK- T933 SIC - LOT 75_6090 E CAMPOLINA TR-2024-09-20_V1.PDF DOCUMENTS VIEW