Permit: TC-MDP-0924-01061
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6532 E PASEO ALGA
Address NEW:
6532 E PASEO ALGA
Apply Date:
09/19/2024
Applicant:
Brianna Quiroz
Description:
510 Eisenhower Model Plan
Permit Reviews
Permit Number - TC-MDP-0924-01061
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/15/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 10/22/2024 | APPROVED |
| 05/07/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/08/2025 | APPROVED |
| 10/08/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/15/2024 | REQUIRES RESUBMIT |
| 09/24/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/01/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01061
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan
| Date | Description | Comments |
|---|---|---|
| 09/25/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/25/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/25/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/25/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01061
Permite Description: 510 Eisenhower Model Plan
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/18/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Site does not use gas |
| 12/18/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Site does not use gas |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01061
Permit Description: 510 Eisenhower Model Plan
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/11/2024 | COT - RSPL - Rough Soil | Passed | Ready to backfill 12/11/24 | |
| 12/11/2024 | COT - RSPL - Sewer | Passed | Ready to backfill 12/11/24 | |
| 12/11/2024 | COT - RSPL - Yard Water Line | Passed | Ready to backfill 12/11/24 | |
| 12/18/2024 | COT - RSEL - Electrical Underground | Passed | Rebar and hold down per plan, ready to pour 12/18/24 | |
| 12/18/2024 | COT - RSEL - Grounding/Bonding | Passed | Rebar and hold down per plan, ready to pour 12/18/24 | |
| 12/18/2024 | COT - RSBU - Preslab | Passed | Rebar and hold down per plan, ready to pour 12/18/24 | |
| 12/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Rebar and hold down per plan, ready to pour 12/18/24 | |
| 01/15/2025 | COT - RSBU - Roof Nailing | Passed | passed 1/15/25 | |
| 01/17/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/17/25 corrections made | |
| 02/10/2025 | BULD - Electrical Clearance | Passed | 2/10/25 approval for TEP clearance ECO | |
| 02/27/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 27 FEB 25 Pass |
|
| 03/19/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/23/2025 | COT - RSEL - Electrical Final | Passed | Partial 5/23/25 CLEARANCE ECO | |
| 05/23/2025 | COT - RSEL - Outdoor Lighting | Passed | Partial 5/23/25 | |
| 05/23/2025 | COT - RSME - Mechanical Final | Passed | Partial 5/23/25 | |
| 05/23/2025 | COT - RSPL - Plumbing Final | Passed | Partial 5/23/25 | |
| 05/23/2025 | ENGR Engineering Final | Passed | CO Ready | |
| 05/23/2025 | RSBU - Building Final | Passed | Partial 5/23/25 | |
| 05/23/2025 | RSBU - Building Progress | Passed | Partial 5/23/25 |