Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6477 E PASEO BARANDA
Apply Date:
12/27/2024
Applicant:
Brianna Quiroz
Description:
510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)

Permit Reviews

Permit Number - TC-MDP-0924-01059
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Start Date Submittal Complete Date Status  
12/27/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 01/06/2025 APPROVED Review Details
08/14/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/19/2025 REQUIRES RESUBMIT Review Details
08/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 08/25/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01059
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Date Description Comments
12/27/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
12/27/2024 Post-Installed Anchor Inspection Report is required.
12/27/2024 Post-Tension Inspection Report is required.
09/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
12/27/2024 Soils testing special condition is required per provided SI Certificate.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01059
Permite Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
02/21/2025 COT - BULD - SWG Clearance N/A Not Applicable n/a
02/21/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable n/a

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01059
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/21/2025 COT - RSPL - Rough Soil Passed 2/21/25 pass
02/21/2025 COT - RSPL - Sewer Passed 2/21/25 pass
02/21/2025 COT - RSPL - Yard Water Line Passed 2/21/25 pass
02/27/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
02/27/2025 COT - RSBU - Preslab Passed
02/27/2025 COT - RSEL - Electrical Underground Passed
03/19/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
03/19/2025 COT - RSBU - Roof Nailing Passed
04/14/2025 BULD - Electrical Clearance Passed 4/14/25
TEP CLEARANCE:ECO
04/14/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/14/2025 COT - RSEL - Grounding/Bonding Passed
05/01/2025 COT - RSBU - Interior Shear Bracing Passed
08/21/2025 COT - RSEL - Electrical Final Passed 8.21.25
Approved
08/21/2025 COT - RSEL - Outdoor Lighting Passed 8.21.25
Approved
08/21/2025 COT - RSME - Mechanical Final Passed 8.21.25
Approved
08/21/2025 COT - RSPL - Plumbing Final Passed 8.21.25
Approved
08/21/2025 ENGR Engineering Final Passed
08/21/2025 RSBU - Building Final Passed 8.21.25
Approved
08/21/2025 RSBU - Building Progress Passed 8.21.25
Approved

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 58 FINAL SIC-2025-08-22_V2.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 58 PRE SIC-2024-12-27_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 58_V1.PDF DOCUMENTS VIEW