Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
6504 E PASEO ALGA
Apply Date:
11/15/2024
Applicant:
Brianna Quiroz
Description:
510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)

Permit Reviews

Permit Number - TC-MDP-0924-01058
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Start Date Submittal Complete Date Status  
11/15/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 12/05/2024 APPROVED Review Details
05/07/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 05/08/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01058
Permit Status: Complete
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Date Description Comments
05/07/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
11/15/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
05/07/2025 Post-Installed Anchor Inspection Report is required.
05/07/2025 Post-Tension Inspection Report is required.
09/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
05/07/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01058
Permite Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
01/08/2025 COT - BULD - SWG Clearance N/A Not Applicable Site does not use gas
01/08/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable SITE DOES NOT USE GAS
06/02/2025 RSBU - Building Progress N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01058
Permit Description: 510 Eisenhower Model Plan (Model master plan TC-MDP-1222-00049)
Total Completed Inspections - 18
Date Description Inspector Results Comments
01/08/2025 COT - RSPL - Rough Soil Passed Plumbing and setbacks per plan, ok to backfill 1/8/25
01/08/2025 COT - RSPL - Sewer Passed Plumbing and setbacks per plan, ok to backfill 1/8/25
01/08/2025 COT - RSPL - Yard Water Line Passed Plumbing and setbacks per plan, ok to backfill 1/8/25
01/08/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Plumbing and setbacks per plan, ok to backfill 1/8/25
01/08/2025 COT - RSEL - Electrical Underground Passed Plumbing and setbacks per plan, ok to backfill 1/8/25
01/16/2025 COT - RSBU - Preslab Passed Rebar and hold downs per plans, ok to pour concrete 1/16/25
01/16/2025 COT - RSEL - Grounding/Bonding Passed Rebar and hold downs per plans, ok to pour concrete 1/16/25
02/10/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/10/25 pass
02/10/2025 COT - RSBU - Roof Nailing Passed 2/10/25 pass
03/05/2025 BULD - Electrical Clearance Passed 5 Mar 25
TEP CLEARANCE: ECO
03/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6 Mar 25
Pass
03/19/2025 COT - RSBU - Interior Shear Bracing Passed
06/02/2025 RSBU - Building Final Passed
06/02/2025 ENGR Engineering Final Passed
06/02/2025 COT - RSEL - Electrical Final Passed
06/02/2025 COT - RSPL - Plumbing Final Passed
06/02/2025 COT - RSEL - Outdoor Lighting Passed
06/02/2025 COT - RSME - Mechanical Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 38 FINAL SIC-2025-05-02_V1.PDF DOCUMENTS VIEW
Z510 EISENHOWER- TRUSS REVIEW LETTER - LAYOUT (STAMPED)_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LA ESTANCIA BLOCK 6 LOT 38 PRE SIC-2024-11-15_V1.PDF DOCUMENTS VIEW
LAE PARCEL 6 LOT 38_V1.PDF DOCUMENTS VIEW