Permit: TC-MDP-0924-01045
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
312 N SUNNY COVE PL
Address NEW:
312 N SUNNY COVE PL
Apply Date:
10/03/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.
Permit Reviews
Permit Number - TC-MDP-0924-01045
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/30/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | APPROVED |
| 10/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/08/2024 | APPROVED |
| 12/24/2024 | SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 | 01/02/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01045
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.
| Date | Description | Comments |
|---|---|---|
| 10/08/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/08/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/31/2025 | Post-Installed Anchor Inspection Report is required. | |
| 10/08/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/08/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01045
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2024 | COT - RSPL - Backwater Valve | Passed | Okay to backfill. Shading required. 12/5/2024 | |
| 12/05/2024 | COT - RSPL - Rough Soil | Passed | Okay to backfill. Shading required. 12/5/2024 | |
| 12/05/2024 | COT - RSPL - Yard Water Line | Passed | Okay to backfill. Shading required. 12/5/2024 | |
| 12/05/2024 | COT - RSPL - Sewer | Passed | Okay to backfill. Shading required. 12/5/2024 | |
| 12/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/13/24 pass | |
| 12/13/2024 | COT - RSBU - Preslab | Passed | 12/13/24 pass | |
| 12/13/2024 | COT - RSEL - Electrical Underground | Passed | pass | |
| 12/13/2024 | COT - RSEL - Grounding/Bonding | Passed | 12/13/24 pass | |
| 12/30/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12-30-24, exterior clips/sheathing approved. Okay to continue with construction. | |
| 12/30/2024 | COT - RSBU - Roof Nailing | Passed | 12-30-24, roof nailing/exterior clips/sheathing approved. Okay to continue with construction. | |
| 01/23/2025 | COT - RSPL - Gas Pressure Test | Passed | 1-23-25, approved | |
| 01/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1-24-25, residential intermediate inspection approved plans. Okay to continue with construction | |
| 01/29/2025 | BULD - Electrical Clearance | Passed | 1/29/25: Correct address label installed on panel. ECO Clearance issued for 312 N Sunny Cove Place. | |
| 02/05/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2-5-25, interior shear bracing inspection approved plans. Okay to tape & texture drywall. | |
| 03/17/2025 | COT - BULD - SWG Clearance | Passed | SWG | |
| 03/25/2025 | COT - RSEL - Electrical Final | Passed | ||
| 03/25/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/25/2025 | COT - RSME - Mechanical Final | Passed | 25 March 25 Condenser is 6" from home exterior wall, however the opposite side has Zero clearance and is butted up against property diving wall. This will affect condenser longevity and performance. |
|
| 03/25/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/25/2025 | RSBU - Building Final | Passed | ||
| 03/25/2025 | RSBU - Building Progress | Passed | ||
| 04/01/2025 | ENGR Engineering Final | Passed |