Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
312 N SUNNY COVE PL
Apply Date:
10/03/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.

Permit Reviews

Permit Number - TC-MDP-0924-01045
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.
Start Date Submittal Complete Date Status  
01/30/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/03/2025 APPROVED Review Details
10/03/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/08/2024 APPROVED Review Details
12/24/2024 SITE FROM MODEL PERMIT - PRODUCTION REVISION v.1 01/02/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01045
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.
Date Description Comments
10/08/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/08/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/31/2025 Post-Installed Anchor Inspection Report is required.
10/08/2024 Post-Tension Inspection Report is required.
09/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/08/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01045
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change (Model Master plan TC-MDP-0223-00506); REV 1: Structure was shifted one foot to the right.
Total Completed Inspections - 22
Date Description Inspector Results Comments
12/05/2024 COT - RSPL - Backwater Valve Passed Okay to backfill. Shading required. 12/5/2024
12/05/2024 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 12/5/2024
12/05/2024 COT - RSPL - Yard Water Line Passed Okay to backfill. Shading required. 12/5/2024
12/05/2024 COT - RSPL - Sewer Passed Okay to backfill. Shading required. 12/5/2024
12/13/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12/13/24 pass
12/13/2024 COT - RSBU - Preslab Passed 12/13/24 pass
12/13/2024 COT - RSEL - Electrical Underground Passed pass
12/13/2024 COT - RSEL - Grounding/Bonding Passed 12/13/24 pass
12/30/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12-30-24, exterior clips/sheathing approved. Okay to continue with construction.
12/30/2024 COT - RSBU - Roof Nailing Passed 12-30-24, roof nailing/exterior clips/sheathing approved. Okay to continue with construction.
01/23/2025 COT - RSPL - Gas Pressure Test Passed 1-23-25, approved
01/24/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1-24-25, residential intermediate inspection approved plans. Okay to continue with construction
01/29/2025 BULD - Electrical Clearance Passed 1/29/25: Correct address label installed on panel. ECO Clearance issued for 312 N Sunny Cove Place.
02/05/2025 COT - RSBU - Interior Shear Bracing Passed 2-5-25, interior shear bracing inspection approved plans. Okay to tape & texture drywall.
03/17/2025 COT - BULD - SWG Clearance Passed SWG
03/25/2025 COT - RSEL - Electrical Final Passed
03/25/2025 COT - RSEL - Outdoor Lighting Passed
03/25/2025 COT - RSME - Mechanical Final Passed 25 March 25
Condenser is 6" from home exterior wall, however the opposite side has Zero clearance and is butted up against property diving wall. This will affect condenser longevity and performance.
03/25/2025 COT - RSPL - Plumbing Final Passed
03/25/2025 RSBU - Building Final Passed
03/25/2025 RSBU - Building Progress Passed
04/01/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
152260 PT LOT 148 COMPLETE-2025-01-27_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 148 REVISED PLOT PLAN_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 148 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 148 SPECIAL INSPECTION CERTIFICATE-2024-10-03_V1.PDF DOCUMENTS VIEW