Permit: TC-MDP-0924-01044
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10430 E SILVER FOX DR
Address NEW:
10430 E SILVER FOX DR
Apply Date:
09/10/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0924-01044
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/30/2024 | APPROVED |
| 03/13/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/17/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01044
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 09/25/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/25/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/25/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01044
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2025 | COT - RSPL - Backwater Valve | Passed | 1/21/25 pass | |
| 01/21/2025 | COT - RSPL - Sewer | Passed | 1/21/25 pass | |
| 01/21/2025 | COT - RSPL - Rough Soil | Passed | 1/21/25 pass ok to backfill and shade. | |
| 01/21/2025 | COT - RSPL - Yard Water Line | Passed | 1/21/25 pass | |
| 01/31/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-31-25, approved. Okay to pour concrete. | |
| 01/31/2025 | COT - RSBU - Preslab | Passed | 1-31-25, approved. Okay to pour concrete. | |
| 01/31/2025 | COT - RSEL - Electrical Underground | Passed | 1-31-25, partial pass for ufer only. | |
| 02/11/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 2-11-25, exterior clips/sheathing approved. Okay to continue with construction. | |
| 02/11/2025 | COT - RSBU - Roof Nailing | Passed | 2-11-25, roof nailing approved. Okay to continue with construction. | |
| 03/06/2025 | COT - RSEL - Grounding/Bonding | Passed | 3/6/25 passed, ok to cover | |
| 03/06/2025 | BULD - Electrical Clearance | Passed | Passed 3/6/25 CLEARANCE ECO | |
| 03/06/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3/6/25 passed, ok to cover | |
| 03/06/2025 | COT - RSPL - Gas Pressure Test | Passed | 3/6/25 passed, ok to cover | |
| 03/19/2025 | COT - RSBU - Interior Shear Bracing | Passed | 3-19-25, shear wall inspection approved. Okay to tape and texture drywall | |
| 04/30/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 4/30/25 | |
| 05/07/2025 | COT - RSEL - Electrical Final | Passed | Passed final 5/7/25 | |
| 05/07/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 5/7/25 | |
| 05/07/2025 | COT - RSME - Mechanical Final | Passed | Passed final 5/7/25 | |
| 05/07/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 5/7/25 | |
| 05/07/2025 | ENGR Engineering Final | Passed | ||
| 05/07/2025 | RSBU - Building Final | Passed | Passed final 5/7/25 | |
| 05/07/2025 | RSBU - Building Progress | Passed | Passed final 5/7/25 |