Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0924-01042
Permit Details
Apply Date:
09/10/2024
Applicant:
Daria Hopkins
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0924-01042
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01042
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
09/25/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
09/25/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/25/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/25/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0924-01042
Permit Status: Inspections
Permit Description: SFR MER1402190 T21-M0078
Date | Description | Comments |
---|---|---|
09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
09/25/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01042
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2024 | COT - RSPL - Rough Soil | Passed | 11/7/24 pass. Ready for backfill, shading required | |
11/07/2024 | COT - RSPL - Yard Water Line | Passed | 11/7/24 pass. Ready for backfill, shading required | |
11/07/2024 | COT - RSPL - Sewer | Passed | 11/7/24 pass. Ready for backfill, shading required | |
11/13/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | pass | |
11/13/2024 | COT - RSBU - Preslab | Passed | pass | |
11/13/2024 | COT - RSEL - Electrical Underground | Passed | pass | |
11/13/2024 | COT - RSEL - Grounding/Bonding | Passed | pass | |
11/26/2024 | COT - RSBU - Roof Nailing | Passed | ||
11/26/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed |