Permit: TC-MDP-0924-01036
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
287 N SUNNY COVE PL
Address NEW:
287 N SUNNY COVE PL
Apply Date:
11/13/2024
Applicant:
Dana Petty
Description:
SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Permit Reviews
Permit Number - TC-MDP-0924-01036
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/15/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/22/2024 | APPROVED |
| 01/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/31/2025 | REQUIRES RESUBMIT |
| 02/04/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/05/2025 | APPROVED |
| 04/17/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 04/21/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01036
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
| Date | Description | Comments |
|---|---|---|
| 11/18/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 11/15/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 11/18/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 01/31/2025 | Post-Installed Anchor Inspection Report is required. | |
| 11/18/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 11/18/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01036
Permite Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/25/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | 25 March 25 1. Bang plates needed throughout 2. Boca plate needed at dryer exhaust top plate. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01036
Permit Description: SFR MER1401840 T21-M0079 (Model master plan TC-MDP-0223-00498)
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2025 | COT - RSPL - Backwater Valve | Passed | 2-13-25, backwater valve, sewer, underground plumbing,main water line inspection approved. Okay to backfill with shading. | |
| 02/13/2025 | COT - RSPL - Rough Soil | Passed | 2-13-25, sewer, underground plumbing,main water line inspection approved. Okay to backfill with shading. | |
| 02/13/2025 | COT - RSPL - Sewer | Passed | 2-13-25, sewer, underground plumbing,main water line inspection approved. Okay to backfill with shading. | |
| 02/13/2025 | COT - RSPL - Yard Water Line | Passed | 2-13-25, main water line inspection approved. Okay to backfill with shading. | |
| 02/20/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2-20-25, excavation/rebar and setbacks approved. Okay to pour concrete | |
| 02/20/2025 | COT - RSBU - Preslab | Passed | 2-20-25, preslab,excavation/rebar and setbacks approved..Okay to pour concrete | |
| 02/20/2025 | COT - RSEL - Electrical Underground | Passed | 2-20-25, electrical underground conduit in place. Okay to pour concrete. | |
| 03/05/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/05/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 03/25/2025 | COT - RSEL - Grounding/Bonding | Passed | 25 March 25 Pass |
|
| 03/25/2025 | BULD - Electrical Clearance | Passed | 25 March 25 TEP CLEARANCE: ECO |
|
| 03/25/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/27/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3-27-25, approved. Okay to continue with construction. | |
| 04/04/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 4/4/25 ok to tape | |
| 05/16/2025 | COT - BULD - SWG Clearance | Passed | Passed 5/16/25 CLEARANCE SWG | |
| 05/20/2025 | COT - RSEL - Electrical Final | Passed | Passed final 5/20/25 | |
| 05/20/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 5/20/25 | |
| 05/20/2025 | COT - RSME - Mechanical Final | Passed | Passed final 5/20/25 | |
| 05/20/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 5/20/25 | |
| 05/20/2025 | RSBU - Building Final | Passed | Passed final 5/20/25 | |
| 05/20/2025 | RSBU - Building Progress | Passed | Passed final 5/20/25 | |
| 05/23/2025 | ENGR Engineering Final | Passed |