Permit: TC-MDP-0924-01035
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
311 N SUNNY COVE PL
Address NEW:
311 N SUNNY COVE PL
Apply Date:
10/25/2024
Applicant:
Dana Petty
Description:
SFR MER1401840 T21-M0079
Permit Reviews
Permit Number - TC-MDP-0924-01035
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/27/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/27/2025 | APPROVED |
| 10/28/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01035
Permit Status: Complete
Permit Description: SFR MER1401840 T21-M0079
| Date | Description | Comments |
|---|---|---|
| 10/29/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/29/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/29/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/29/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01035
Permite Description: SFR MER1401840 T21-M0079
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/23/2024 | COT - RSPL - Backwater Valve | N/A | Canceled | |
| 12/23/2024 | COT - RSPL - Rough Soil | N/A | Canceled | |
| 12/23/2024 | COT - RSPL - Sewer | N/A | Canceled | |
| 12/23/2024 | COT - RSPL - Yard Water Line | N/A | Canceled |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01035
Permit Description: SFR MER1401840 T21-M0079
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/31/2024 | COT - RSPL - Backwater Valve | Passed | 12/31/24. PASS, OK to backfill, shading required. | |
| 12/31/2024 | COT - RSPL - Rough Soil | Passed | 12/31/24. PASS, OK to backfill, shading required. | |
| 12/31/2024 | COT - RSPL - Sewer | Passed | 12/31/24. PASS, OK to backfill, shading required. | |
| 12/31/2024 | COT - RSPL - Yard Water Line | Passed | 12/31/24. PASS, OK to backfill, shading required. | |
| 01/09/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 1-9-25, excavation/rebar layout approved. Okay to pour concrete. | |
| 01/09/2025 | COT - RSBU - Preslab | Passed | 1-9-25, preslab,excavation/rebar layout approved. Okay to pour concrete. | |
| 01/09/2025 | COT - RSEL - Electrical Underground | Passed | 1-9-25, electrical underground approved | |
| 01/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/21/25 pass. Shear walls were corrected while onsite. | |
| 01/21/2025 | COT - RSBU - Roof Nailing | Passed | 1/21/25 pass | |
| 02/19/2025 | BULD - Electrical Clearance | Passed | TEP ECO Clearance issued for 311 N Sunny Cove Pl. | |
| 02/19/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in are complete. Okay to proceed with installation of insulation and drywall. | |
| 02/19/2025 | COT - RSPL - Gas Pressure Test | Passed | Gas lines are under 15 psi of air pressure with no leaks. | |
| 03/03/2025 | COT - RSEL - Grounding/Bonding | Passed | 3/3/25 ufer connected | |
| 03/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | Shear wall nailing per plan, ok to cover 3/3/25 | |
| 04/11/2025 | COT - BULD - SWG Clearance | Passed | Passed 4/11/25 CLEARANCE SWG | |
| 04/17/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/17/25 | |
| 04/17/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | RSBU - Building Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | RSBU - Building Progress | Passed | Passed final 4/17/25 | |
| 04/22/2025 | ENGR Engineering Final | Passed |