Permit: TC-MDP-0924-01019
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
12804 E LAZY J RANCH PL
Address NEW:
12804 E LAZY J RANCH PL
Apply Date:
09/16/2024
Applicant:
Brandon Kempel
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)
Permit Reviews
Permit Number - TC-MDP-0924-01019
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/20/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/26/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01019
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/13/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 09/24/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 09/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 09/24/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 09/24/2024 | Post-Tension Inspection Report is required. |
| 09/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0924-01019
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Date | Description | Comments |
|---|---|---|
| 09/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01019
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - RSPL - Gas Pressure Test | N/A | Re-inspection required | 12-16-24, gas pressure at 8. Test must be at 15psi for a minimum of 10 minutes. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01019
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 20
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/22/2024 | COT - RSPL - Backwater Valve | Passed | 10/22/24 OK to backfill, shading required. | |
| 10/22/2024 | COT - RSPL - Rough Soil | Passed | 10/22/24 OK to backfill, shading required. | |
| 10/22/2024 | COT - RSPL - Sewer | Passed | 10/22/24 PASS. SWG clearence | |
| 10/22/2024 | COT - RSPL - Yard Water Line | Passed | 10/22/24 OK to backfill, shading required. | |
| 10/30/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly spaced, masa clips and hold downs are installed, underground electrical is in place, underground plumbing pipes are properly wrapped, and Ufer ground is installed. | |
| 10/30/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is properly spaced, masa clips and hold downs are installed, underground electrical is in place, underground plumbing pipes are properly wrapped, and Ufer ground is installed. | |
| 10/30/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly spaced, masa clips and hold downs are installed, underground electrical is in place, underground plumbing pipes are properly wrapped, and Ufer ground is installed. | |
| 12/13/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12/13/24 corrections have been made. Ok to proceed. | |
| 12/13/2024 | COT - RSBU - Roof Nailing | Passed | 12/13/24 corrections have been made. Ok to proceed. | |
| 12/16/2024 | BULD - Electrical Clearance | Passed | 12-16-24, electrical panel okay to be energized. ECO clearance sent to TEP. | |
| 12/16/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-16-24, grounding/bonding approved. | |
| 12/18/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/18/24. Vapor barrier penetrations have been sealed, straps were added to dwv, wires secured off gusset plates and tear in the flex line has been taped. Pass | |
| 01/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall shear walls are properly secured to the studs per plan requirements. Okay to proceed with tape, texture, and paint | |
| 03/06/2025 | COT - BULD - SWG Clearance | Passed | 6 March 23 Southwest gas clearance: SWG |
|
| 03/18/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 03/18/2025 | COT - RSME - Mechanical Final | Passed | ||
| 03/18/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 03/25/2025 | RSBU - Building Final | Passed | passed by ODAIR | |
| 03/25/2025 | ENGR Engineering Final | Passed | CO Ready Note: bathroom window being replaced. |
|
| 03/25/2025 | COT - RSEL - Electrical Final | Passed | passed by ODAIR |