Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
09/16/2024
Applicant:
Brandon Kempel
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)

Permit Reviews

Permit Number - TC-MDP-0924-01019
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Start Date Submittal Complete Date Status  
09/20/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 09/26/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01019
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
Date Name
09/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/24/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
09/24/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/24/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/24/2024 Post-Tension Inspection Report is required.
09/24/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0924-01019
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Date Description Comments
09/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01019
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
12/16/2024 COT - RSPL - Gas Pressure Test N/A Re-inspection required 12-16-24, gas pressure at 8. Test must be at 15psi for a minimum of 10 minutes.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01019
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 20
Date Description Inspector Results Comments
10/22/2024 COT - RSPL - Backwater Valve Passed 10/22/24 OK to backfill, shading required.
10/22/2024 COT - RSPL - Rough Soil Passed 10/22/24 OK to backfill, shading required.
10/22/2024 COT - RSPL - Sewer Passed 10/22/24 PASS. SWG clearence
10/22/2024 COT - RSPL - Yard Water Line Passed 10/22/24 OK to backfill, shading required.
10/30/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly spaced, masa clips and hold downs are installed, underground electrical is in place, underground plumbing pipes are properly wrapped, and Ufer ground is installed.
10/30/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is properly spaced, masa clips and hold downs are installed, underground electrical is in place, underground plumbing pipes are properly wrapped, and Ufer ground is installed.
10/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly spaced, masa clips and hold downs are installed, underground electrical is in place, underground plumbing pipes are properly wrapped, and Ufer ground is installed.
12/13/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 12/13/24 corrections have been made. Ok to proceed.
12/13/2024 COT - RSBU - Roof Nailing Passed 12/13/24 corrections have been made. Ok to proceed.
12/16/2024 BULD - Electrical Clearance Passed 12-16-24, electrical panel okay to be energized. ECO clearance sent to TEP.
12/16/2024 COT - RSEL - Grounding/Bonding Passed 12-16-24, grounding/bonding approved.
12/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12/18/24. Vapor barrier penetrations have been sealed, straps were added to dwv, wires secured off gusset plates and tear in the flex line has been taped. Pass
01/13/2025 COT - RSBU - Interior Shear Bracing Passed Drywall shear walls are properly secured to the studs per plan requirements. Okay to proceed with tape, texture, and paint
03/06/2025 COT - BULD - SWG Clearance Passed 6 March 23
Southwest gas clearance: SWG
03/18/2025 COT - RSPL - Plumbing Final Passed
03/18/2025 COT - RSME - Mechanical Final Passed
03/18/2025 COT - RSEL - Outdoor Lighting Passed
03/25/2025 RSBU - Building Final Passed passed by ODAIR
03/25/2025 ENGR Engineering Final Passed CO Ready
Note: bathroom window being replaced.
03/25/2025 COT - RSEL - Electrical Final Passed passed by ODAIR