Permit: TC-MDP-0924-01018
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
12735 E LAUREN CANYON PL
Address NEW:
12735 E LAUREN CANYON PL
Apply Date:
09/30/2024
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)
Permit Reviews
Permit Number - TC-MDP-0924-01018
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/04/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01018
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 09/13/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 10/04/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 10/04/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/04/2024 | Post-Tension Inspection Report is required. |
| 10/04/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0924-01018
Permit Status: Inspections
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
| Date | Description | Comments |
|---|---|---|
| 09/13/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 10/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01018
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Canceled | Canceled by John |
| 01/06/2025 | COT - RSBU - Roof Nailing | N/A | Canceled | Canceled by John |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01018
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2024 | COT - RSPL - Backwater Valve | Passed | 12-5-24, underground plumbing, sewer connection, main water line, and backwater valve verified as per approved plans. Okay to backfill. | |
| 12/05/2024 | COT - RSPL - Rough Soil | Passed | 12-5-24, underground plumbing, sewer connection, main water line, and backwater valve verified as per approved plans. Okay to backfill. | |
| 12/05/2024 | COT - RSPL - Sewer | Passed | 12-5-24, underground plumbing, sewer connection, main water line, and backwater valve verified as per approved plans. Okay to backfill. | |
| 12/05/2024 | COT - RSPL - Yard Water Line | Passed | 12-5-24, underground plumbing, sewer connection, main water line, and backwater valve verified as per approved plans. Okay to backfill. | |
| 12/12/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-12-24, excavation/rebar,electrical underground,grounding/bonding inspection approved. Okay to pour concrete. | |
| 12/12/2024 | COT - RSBU - Preslab | Passed | 12-12-24, preslab,excavation/rebar,electrical underground,grounding/bonding inspection approved. Okay to pour concrete. | |
| 12/12/2024 | COT - RSEL - Electrical Underground | Passed | 12-12-24, electrical underground,grounding/bonding inspection approved. Okay to pour concrete. | |
| 12/12/2024 | COT - RSEL - Grounding/Bonding | Passed | 12-12-24, grounding/bonding inspection approved. Okay to pour concrete. | |
| 01/07/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | Per plans, ok to proceed 1/7/25 | |
| 01/07/2025 | COT - RSBU - Roof Nailing | Passed | Per plans, ok to proceed 1/7/25 | |
| 02/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | passed, ok to proceed to drywall | |
| 02/05/2025 | COT - RSPL - Gas Pressure Test | Passed | Held pressure 2/4/25 | |
| 02/05/2025 | BULD - Electrical Clearance | Passed | Ready for temp power CLEARANCE ECO 2/5/25 | |
| 02/20/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2/20/25 pass | |
| 04/02/2025 | COT - BULD - SWG Clearance | Passed | Passed 4/2/25 CLEARANCE SWG | |
| 04/15/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/15/25 | |
| 04/15/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/15/25 | |
| 04/15/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/15/25 | |
| 04/15/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/15/25 | |
| 04/15/2025 | ENGR Engineering Final | Passed | ||
| 04/15/2025 | RSBU - Building Final | Passed | Passed final 4/15/25 |