Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/07/2024
Applicant:
Description:
SFR RKM45R T21-M0093 (REVISION Delta 4)

Permit Reviews

Permit Number - TC-MDP-0924-01017
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Start Date Submittal Complete Date Status  
10/08/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/10/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01017
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Activity Conditions - 6
Date Name
09/13/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/10/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/10/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
10/10/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/10/2024 Post-Tension Inspection Report is required.
10/10/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0924-01017
Permit Status: Inspections complete
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Date Description Comments
10/08/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/13/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/10/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01017
Permite Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
02/18/2025 BULD - Electrical Clearance N/A Not Ready 2/18/25 not ready, breakers needed in the main panel.
05/09/2025 COT - RSEL - Electrical Final N/A Re-inspection required Per previous notes. 5/9/2025
05/09/2025 COT - RSME - Mechanical Final N/A Re-inspection required Per previous notes. 5/9/2025
05/09/2025 RSBU - Building Final N/A Re-inspection required Per previous notes. 5/9/2025

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01017
Permit Description: SFR RKM45R T21-M0093 (REVISION Delta 4)
Total Completed Inspections - 21
Date Description Inspector Results Comments
12/10/2024 COT - RSPL - Rough Soil Passed 12-10-24, underground plumbing approved. Okay to backfill with shading.
12/10/2024 COT - RSPL - Sewer Passed 12-10-24, sewer connection approved. Okay to backfill with shading.
12/10/2024 COT - RSPL - Yard Water Line Passed 12-10-24, main water line inspection approved. Okay to backfill.
12/23/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12/23/24 passed, ok to pour concrete
12/23/2024 COT - RSBU - Preslab Passed 12/23/24 passed, ok to pour concrete
12/23/2024 COT - RSEL - Electrical Underground Passed 12/23/24 passed, ok to pour concrete
12/23/2024 COT - RSEL - Grounding/Bonding Passed 12/23/24 passed, ok to pour concrete
01/23/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1/23/25 pass
01/23/2025 COT - RSBU - Roof Nailing Passed 1/23/25 pass
02/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2/18/25 pass
02/18/2025 COT - RSPL - Gas Pressure Test Passed 2/18/25 pass
03/05/2025 BULD - Electrical Clearance Passed 3/5/25 passed CLEARANCE ECO
03/07/2025 COT - RSBU - Interior Shear Bracing Passed 7 March 25
Pass
05/01/2025 COT - BULD - SWG Clearance Passed 5/1/25: SWG CLEARANCE
05/06/2025 COT - RSEL - Outdoor Lighting Passed
05/06/2025 COT - RSPL - Plumbing Final Passed
05/06/2025 ENGR Engineering Final Passed
05/06/2025 RSBU - Building Progress Passed
05/12/2025 COT - RSEL - Electrical Final Passed
05/12/2025 COT - RSME - Mechanical Final Passed 05/12/25
Pass
05/12/2025 RSBU - Building Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-10-07_V1.PDF DOCUMENTS VIEW